Browse
Search
OUTBoard agenda 081617
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 081617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:26:54 AM
Creation date
3/26/2018 10:26:04 AM
Metadata
Fields
Template:
BOCC
Date
8/16/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 081617
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status <br />R-5787B <br />44917.3.3 <br />Curb ramp improvements at various intersections in Orange <br />and Alamance Co. <br />7/6/17 Fall 2017 $303,400 Planning and design activities <br />underway. <br />SS-4907BS <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and SR <br />1114 (Buckhorn Road) East of Mebane. <br />Aug. 2017 Fall 2017 $40,500 R/W <br />$43,200 CON <br />Signal design complete, R/W <br />acquisition complete and certified <br />SS-4907BW <br />47356.1.1 47356.3.1 <br />Intersection improvements at SR 1114 (Buckhorn Road) and <br />SR 1146 (West Ten Road) east of Mebane. Convert two way <br />stop to ALL WAY STOP. Construct radius improvements to <br />accommodate turning traffic <br />Sept. 2017 Dec. 2017 $3000 PE <br />$55,000 CON <br />Planning and design activities <br />underway. <br />U-5549/SS-4907AZ <br />50153.3.F1 <br />44227 <br />44247 <br />Churton Street Access Improvements - Traffic signal and curb <br />ramp revisions on east side of NC 86 (Churton Street) at SR <br />1150/SR 1002 (King Street), and NC 86 (Churton Street) at <br />Margaret Street. Grading, curb & gutter, crosswalks and <br />signal modifications on the west side of NC 86 /US 70 <br />Bus.(Churton Street) from Tryon Street to just south of <br />Margaret Street. Grading, curb & gutter, crosswalk and bus <br />pull-out on NC 86 / US 70 Bus. (Churton Street) from south of <br />Margaret Street to just south of Nash and Koolock Street in <br />Hillsborough. <br />11/1/2016 Fall 2017 $156,000 CON <br />$245,000 CON <br />$120,000 CON <br />Construction underway - 15% <br />complete <br />U-5846 <br />50236.1.1 <br />50236.2.1 <br />50236.3.1 <br />Construct a Roundabout at SR 1772 (Greensboro Street) and <br />SR 1780 (Estes Drive) in Carrboro. <br />Jan. 2018 Mar. 2019 $775,000 Planning and design activities <br />underway <br />U-5847 <br />50238.1.1 <br />50238.2.1 <br />50238.3.1 <br />Intersection improvements at SR 1010 (West Franklin St.) <br />and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in <br />Chapel Hill / Carrboro. <br />Jan. 2019 Mar. 2019 $775,000 Planning and design activities <br />underway <br />U-5854 <br />46382.1.1 <br />46328.2.1 <br />46382.3.1 <br />Construct a roundabout at SR 1008 (Mt. Carmel Church <br />Road) and SR 1913 (Bennett Road) in Chapel Hill <br />Jun. 2018 Fall 2019 $775,000 Planning and design activities <br />underway, Utility coordination <br />underway <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />AT <br />T <br />. <br /> <br />1 <br />33
The URL can be used to link to this page
Your browser does not support the video tag.