Browse
Search
OUTBoard agenda 062117
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 062117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:25:53 AM
Creation date
3/26/2018 10:22:40 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 062117
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5)US‐70/I‐85 Connector – US‐70 is a two‐lane road with a speed limit of 50 mph. I‐85 Connector is a <br />four‐lane divided highway with a speed limit of 55 mph. This current configuration operates at LOS <br />C. Poor connectivity led to an interchange reconfiguration project which did not score well enough <br />to receive funding in NCDOT’s prioritization process, and a more cost effective alternative was <br />requested. NCDOT Highway Division 7 has studied this intersection to determine whether a <br />roundabout or signalization would be more effective in the realignment of the intersection and <br />determined a roundabout would yield better results. With the realignment and added traffic for <br />2025, this intersection would operate at LOS D. <br />2016 <br />63
The URL can be used to link to this page
Your browser does not support the video tag.