Browse
Search
OUTBoard agenda 062117
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 062117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:25:53 AM
Creation date
3/26/2018 10:22:40 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 062117
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC VOLUME ANALYSIS <br />After developing the proposed roadway network, Volkert assigned the traffic volumes generated as <br />discussed above to the roadway network. Information indicating the process used to generate traffic <br />volumes is included in Attachment D. <br />For the areas with future development proposed, Volkert assumed that all traffic would be going to/ <br />coming from the closest interchange, i.e.: traffic on the west side of the study area would be going to <br />the interchange at Buckhorn Road and I‐40 and any traffic on the east side would be going to the <br />interchange at Mount Willing Road and I‐40. The Pod Traffic volumes generated in Table 1 were added <br />to the future 2025 AADTs of the existing roadway network based on the proposal access points. Pod <br />traffic volumes were assigned proportionally to each access point. Volkert assumed that fifty percent <br />of the project traffic going through the interchanges would be headed westbound on I‐40 and the other <br />fifty percent would be headed eastbound. <br />These volumes were added to the volumes from the NCDOT traffic volume maps for the area to give a <br />general idea of how many lanes would need to be created for new roads or added to existing roads. <br />The daily traffic volumes along with the AM and PM peak hour traffic volumes are provided in the <br />following figures for the Buckhorn Road, W. Ten Road, and Mt. Willing Road interchanges with I‐40. <br />Existing and future AADT’s are shown in figures 9 and 10 respectively. It should be noted that a future <br />interchange at Mattress Factory Road has been proposed by the Burlington‐Graham Metropolitan <br />Planning Organization (B‐G MPO) and will significantly impact traffic counts if constructed. <br />Recommendations for the future road network are to 2025 and may require additional technical <br />analysis at the time of implementation. <br />47
The URL can be used to link to this page
Your browser does not support the video tag.