Orange County NC Website
TIP/WBS # Description Start/Let date Completion Date Status Cost Comments <br />R-5787B <br />44917.3.3 <br />Curb ramp improvements at various intersections in Orange and <br />Alamance Co. <br />May. 2017 Fall 2017 Planning and design <br />activities underway. <br />$100,000 TAP, DMP <br />SS-4907BS <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and SR 1114 <br />(Buckhorn Road) East of Mebane. <br />Apr. 2017 Jun. 2017 Signal design complete, <br />R/W plans being developed <br />$40,500 R/W <br />$43,200 CON <br />State Spot Safety, Constr. By <br />State Forces, May need R/W <br />U-5846 <br />50236.1.1 <br />50236.2.1 <br />50236.3.1 <br />Construct a Roundabout at SR 1772 (Greensboro Street) and SR <br />1780 (Estes Drive) in Carrboro. <br />Jan. 2018 Mar. 2019 Planning and design <br />activities underway, R/W <br />plans complete June 2017 <br />$775,000 STIP, P3.0, PEF-SEPI, Surveys <br />received 3/15, DMP, Public <br />meeting on Nov. 14 <br />U-5847 <br />50238.1.1 <br />50238.2.1 <br />50238.3.1 <br />Intersection improvements at SR 1010 (West Franklin St.) and SR <br />1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in Chapel Hill / <br />Carrboro. <br />Jan. 2019 Mar. 2019 Planning and design <br />activities underway, R/W <br />plans complete Jan. 2018 <br />$775,000 STIP, P3.0, PEF-STANTEC, <br />Surveys received, traffic forecast <br />and analysis complete, DMP <br />U-5854 <br />46382.1.1 <br />46328.2.1 <br />46382.3.1 <br />Construct a roundabout at SR 1008 (Mt. Carmel Church Road) and <br />SR 1913 (Bennett Road) in Chapel Hill <br />Jun. 2018 Fall 2019 Planning and design <br />activities underway, R/W <br />plans complete June 2017, <br />utility coordination <br />underway <br />$775,000 STIP, P3.0,PEF-SEPI, DMP <br />W-5707A <br />44853.1.1 <br />Curb ramp improvements for ADA compliance at the following <br />intersections: SR 2048 (South Road) at Raleigh Street; SR 2048 <br />(South Road) at Country Club Road, SR 1902 (Manning Drive) at <br />Paul Hardin Drive, and SR 1902 (Manning Drive) at Ridge Road / <br />Skipper Bowles Road in Chapel Hill <br />4/20/2017 7/31/17 Planning and design <br />activities underway. Signal <br />pedestrain improvements <br />complete. <br />$10,000 PE <br />$60,000 CON <br />HSIP, DMP <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO <br />Page 1 DCHCMPO 3-3-17.xlsx <br />It <br />e <br />m <br /> <br />7 <br />e <br />10 <br />3