Browse
Search
OUTBoard agenda 041917
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 041917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:22:28 AM
Creation date
3/26/2018 10:20:48 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 041917
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 7.a. <br />Orange County & NCDOT Highway Luncheon Meeting Notes <br />Division 7 and District 1 <br />March 29, 2017 12:00 p.m. <br /> <br /> <br />Future Bridge Replacement Projects <br />Bradshaw-Quarry Rd – <br />Anticipated start 2017 TBD, <br />Anticipated completion TBD <br />2017 <br /> Arthur Minnis Rd – <br />Anticipated Start 2017 TBD, <br />Anticipated completion TBD <br />2017 <br />Edmund Latta Rd –Scheduled <br />begin construction April 2017/ <br />Anticipated complete June 2017 <br />Lib Rd –Scheduled begin <br />construction April <br />2017/Anticipated completion <br />July 2017 <br /> Atkins Rd –Scheduled begin <br />construction May <br />2017/Anticipated completion <br />August 2017 <br /> <br /> <br /> <br /> <br /> <br />IV. UPDATES <br /> <br />a) Downtown Hillsborough Improvements (Margaret Hauth) <br /> <br />All needed NCDOT approvals are finally in-hand for the downtown access <br />project. Hillsborough has a contractor and signed contracts. Work is expected <br />to begin mid-April. A public information session was held on March 20. A pre- <br />construction meeting was held on March 28. The project provides accessible <br />curb ramps and crosswalks at all downtown intersections, additional sidewalk <br />connections to key destinations and widened sidewalks in congested areas. <br />More detailed project description is available on the Town website. <br /> <br />The east side work adjacent to the courthouse will be done first, and then <br />work will move to Tryon Street and move south. There is also an email list for <br />merchants and others to receive regular updates. Anyone wanting to be <br />included on that list should contact Hillsborough Planner Stephanie <br />Trueblood. Work will continue through the summer. Once the sidewalk work is <br />completed, NCDOT will have to schedule the resurfacing of Churton Street. <br />Once that is scheduled and complete, the stamped crosswalk improvements <br />will be the final step. <br /> <br />b) Too-brief signalization limiting traffic headed north/south on Nash Street at its <br />intersection with West King in west Hillsborough (NCDOT) - Timing updates <br />have been completed to extend the signal to 25 seconds. <br /> <br />c) Schley Road Crash Analysis (Max Bushell) <br /> <br />An Orange County resident recently informed Orange County Transportation <br />Planning staff of a recent severe crash along Schley Road close to the <br />intersection of Schley Road and New Sharon Church Road. In examining the <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.