Orange County NC Website
Attachment 4: Draft Triangle Area Rural Planning Organization (TARPO) Project List <br /> <br />Road/Dodsons Cross Road to Neville Road is at capacity and will only continue to substantially exceed capacity in future years. Given these figures, it is also likely <br />that traffic along the segment of NC 54 from Neville Road to Old Fayetteville Road is also at or over capacity. Specific user input on the subject corridor reveals the <br />lack of usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signali zation. User input also reveals the <br />presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right turns at some intersecting streets and <br />entrances to businesses along the corridor. Among all projects recommended in the OCCTP, this project would likely score the highest relative to other projects <br />given the improvements the project would provide for both congestion and benefit-cost factors. This project is also eligible for funding at both the regional and <br />divisional tiers, providing it a greater opportunity to be funded than projects that are only eligible for funding at the division tier. This particular project is a subset of <br />the project involving operational improvements to NC 54 from Orange Grove Road to Old Fayetteville Road and is being considered for submission separately <br />because of its ability to score higher by targeting a more congested segment of the corridor. <br /> <br />This project will also be submitted as part of the DCHC MPO project list because it overlaps the MPO’s planning area boundary. <br />NC 54 Widening Project <br />(Orange Grove Road to <br />Old Fayetteville Road) <br />Description: Widen NC 54 from Orange Grove Road (SR 1006) to Old Fayetteville Road (SR 1937/1107) to a four (4) lane boulevard to address congestion, safety, <br />and intersecting street turning movement delays. This project would include access management, some new signalization, and would increase the footprint of NC <br />54 substantially. This facility and the subject corridor are recommended in the Orange County Comprehensive Transportation Plan (OCCTP) as in need of widening <br />from two (2) lanes to four (4) lanes, which is the form the project took when submitted for consideration of inclusion in the 2016-2025 STIP. This project was also <br />submitted for consideration of inclusion in the 2018-2027 STIP, but was not funded. <br /> <br />Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially exceed the existing roadway capacity by <br />2035, warranting an increase in capacity through widening. NCDOT traffic figures already indicate that traffic along the segment of NC 54 from Butler <br />Road/Dodsons Cross Road to Neville Road is at capacity and will only continue to substantially exceed capacity in future years. Given these figures, it is also likely <br />that traffic along the segment of NC 54 from Neville Road to Old Fayetteville Road is also at or over capacity. Specific user input on the subject corridor reveals the <br />lack of usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signalization. User input also reveals the <br />presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right turns at some intersecting streets and <br />entrances to businesses along the corridor. Among all projects recommended in the OCCTP, this project would likely score the highest relative to other projects <br />given the improvements the project would provide for both congestion and benefit-cost factors. This project is also eligible for funding at both the regional and <br />divisional tiers, providing it a greater opportunity to be funded than projects that are only eligible for funding at the division tier. <br />Removed from <br />Consideration due to the <br />NC 54 Operations Project <br />and Ongoing NC 54 <br />Corridor Study <br />Orange Grove <br />Road/Buckhorn Road <br />Paved Shoulders <br />Description: Widen Orange Grove Road (SR 1006) from Dairyland Road (SR 1177) to Buckhorn Road (SR 1114) and Buckhorn Road (SR 1114) from Orange <br />Grove Road (SR 1006) to West Ten Road (SR 1144) to include four (4)-foot paved shoulders. This project is recommended as a set of bikeway improvements in <br />the OCCTP. <br /> <br />Need: This project would provide one segment of a bikeway connection through western Orange County from Carrboro to the Buckhorn Road and Mebane area <br />and improve the safety of the subject thoroughfare for both bicyclists and motorized vehicular travel. The project is not likely to score very high using the State’s <br />bike/pedestrian scoring factors because of its rural context and is only eligible for funding at the division tier. <br />Removed from <br />Consideration Due to Public <br />Desire to Retain Corridor <br />As Is <br /> <br /> 23