Browse
Search
OUTBoard agenda 041917
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 041917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:22:28 AM
Creation date
3/26/2018 10:20:48 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 041917
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 4: Draft Triangle Area Rural Planning Organization (TARPO) Project List <br /> <br />Rank/ Map ID #* Project Project Description/Need SPOT 3.0 <br />Score <br />SPOT 4.0 <br />Score <br />6 <br />Orange Grove <br />Road/Dodsons <br />Crossroads Paved <br />Shoulders <br />Description: Widen Orange Grove Road (SR 1006) from I-40 to Dodsons Crossroads (SR 1102) and Dodsons Crossroads (SR 1102) from <br />Orange Grove Road (SR 1006) to Dairyland Road (SR 1177) to include four (4)-foot paved shoulders. This project is recommended as a set <br />of bikeway improvements in the OCCTP. <br /> <br />Need: This project would provide bicycle facilities to the Grady Brown Elementary School and Cedar Ridge High School from the area south <br />of the schools and connect to a proposed bikeway facility on Orange Grove Road northward into Hillsborough. The project would also improve <br />safety for motorized vehicular travel on this segment of Orange Grove Road. The project is not likely to score very high using the State’s <br />bike/pedestrian scoring factors because of its rural context and is only eligible for funding in the division tier. <br />15.09 Division <br />Not Carried <br />Forward @ <br />RPO Level <br />*Map ID Number corresponds to the general location of each project on Attachment 4: TARPO Project List Map. <br />** Bicycle (and pedestrian) projects require a 20% local match and must be locally administered. Right-of-way acquisition is also not a permissible cost to be funded by NCDOT for these projects. Bicycle projects may be <br />eliminated from the RPO process to submit projects for prioritization in the absence of a letter of commitment from the Board of County Commissioners providing funding for the local match, right-of-way costs, and local <br />administration. <br /> <br /> <br />Projects Deleted From Draft Priority List <br />Project Project Description Reason For Deletion <br />NC 54 Operational <br />Improvements (Orange <br />Grove Road to Old <br />Fayetteville Road) <br />Description: Implement operational improvements along NC 54 from Orange Grove Road (SR 1006) to Old Fayetteville Road (SR 1937/1107) to address <br />congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative to <br />widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side <br />streets, and other possible treatments. This facility and the subject corridor are recommended in the Orange County Comprehensive Transportation Plan (OCCTP) <br />as in need of widening from two (2) lanes to four (4) lanes, which is the form the project took when last submitted for consideration of inclusion in the 2016-2025 <br />STIP. These proposed operational improvements to the facility are an alternative to the initially conceived widening project and come in response to opposition by <br />Town of Carrboro planning staff regarding the facility’s widening. The OUTBoard was presented with both options and voted to recommend pursuit of the option to <br />implement these alternative operational improvements. <br /> <br />Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Fayetteville Road will substantially exceed the existing roadway capacity by <br />2035, warranting an increase in capacity through widening. NCDOT traffic figures already indicate that traffic along the segment of NC 54 from Butler <br />Road/Dodsons Cross Road to Neville Road is at capacity and will only continue to substantially exceed capacity in future years. Given these figures, it is also likely <br />that traffic along the segment of NC 54 from Neville Road to Old Fayetteville Road is also at or over capacity. Specific user input on the subject corridor reveals the <br />lack of usable gaps in traffic streams at intersecting streets during peak periods that otherwise might be created by signali zation. User input also reveals the <br />presence of extensive travel lane delay on the NC 54 facility as a result of the lack of adequate storage for left and right turns at some intersecting streets and <br />entrances to businesses along the corridor. Among all projects recommended in the OCCTP, this project would likely score the highest relative to other projects <br />given the improvements the project would provide for both congestion and benefit-cost factors. This project is also eligible for funding at both the regional and <br />divisional tiers, providing it a greater opportunity to be funded than projects that are only eligible for funding at the division tier. <br /> <br />This project will also be submitted as part of the DCHC MPO project list because it overlaps the MPO’s planning area boundary. <br />Funded under SPOT P4.0 <br />NC 54 Operational <br />Improvements (Dodsons <br />Crossroads/Butler Road <br />to Old Fayetteville Road) <br />Description: Implement operational improvements along NC 54 from Dodsons Crossroads/Butler Road (SR 1102/1951) to Old Fayetteville Road (SR 1937/1107) to <br />address congestion, safety, intersecting street turning movement delays, and the lack of usable gaps in traffic for side street access to the facility as an alternative <br />to widening the facility to four (4) lanes. Improvements may involve signalization at problem intersections, additional dedicated left and right turn storage at side <br />streets, and other possible treatments. This facility and the subject corridor are recommended in the Orange County Comprehensive Transportation Plan (OCCTP) <br />as in need of widening from two (2) lanes to four (4) lanes, which is the form the project took when last submitted for consideration of inclusion in the 2016-2025 <br />STIP. These proposed operational improvements to the facility are an alternative to the initially conceived widening project and come in response to opposition by <br />Town of Carrboro planning staff regarding the facility’s widening. The OUTBoard was presented with both options and voted to recommend pursuit of the option to <br />implement these alternative operational improvements. <br /> <br />Need: NCDOT projections reveal that traffic on NC 54 from Orange Grove Road to Old Fayetteville Road will substantially exceed the existing roadway capacity by <br />2035, warranting an increase in capacity through widening. NCDOT traffic figures already indicate that traffic along the segment of NC 54 from Butler <br />Project Extents Modified to <br />Previous Project <br /> 22
The URL can be used to link to this page
Your browser does not support the video tag.