Browse
Search
OUTBoard agenda 041917
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 041917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:22:28 AM
Creation date
3/26/2018 10:20:48 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 041917
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />it is important to note that these changes may have some implications for many of the projects <br />Orange County has previously submitted and will likely be submitting in this next iteration of <br />priorities. Further information on the SMF is accessible using the following weblink: <br /> <br />https://www.ncdot.gov/strategictransportationinvestments/ <br /> <br />SPOT P4.0 (May 2015 – January 2017) <br />Orange County was successful in obtaining funding for five projects through the 2018-2027 <br />STIP P4.0 prioritization process. Attachment 1 indicates the geographic location of all of the <br />funded and unfunded projects across Orange County, while Attachment 2 lists the projects <br />funded as part of the P4.0 process and provides a brief description. <br /> <br />More information on the STIP development as it was implemented in the P4.0 process is <br />accessible using the following weblink: <br /> <br />https://www.ncdot.gov/download/strategictransportationinvestments/P4_Fact_Sheet.pdf <br /> <br />An interactive map providing all of the projects included in the draft 2018-2027 STIP can be <br />found at this weblink: <br /> <br />http://ncdot.maps.arcgis.com/home/webmap/viewer.html?webmap=f311e4eaea4b4a8eabd6d5d <br />9cbe3d648 <br /> <br />SPOT P5.0 Schedule <br />In preparation for the P5.0 process, Orange County is again asked to submit its priority list of <br />projects to the BGMPO, DCHC MPO, and TARPO for proposed projects contained within each <br />organization’s respective planning area. Based on the State’s timeline for the adoption of its final <br />2020-2029 STIP, any new projects must be entered between July 5, 2017 and September 15, <br />2017. As such, the Orange Unified Transportation Board (OUTBoard) is scheduled to consider <br />and recommend to the BOCC project lists for BGMPO, TARPO and DCHC MPO at its April 19th <br />meeting to be forwarded to the BOCC for consideration at its May 2nd meeting. The lists will then <br />be assessed and prioritized at each MPO and RPO with input from the local jurisdictions. Local <br />elected officials will have an opportunity to review the list as well. <br /> <br />At the DCHC MPO, its Technical Committee will review and approve the priority project list at its <br />meeting on May 24th; the MPO Board will be asked to approve at its meeting on June 14 th. With <br />this timeline in mind, the deadline to submit a project list is April 17 th. At TARPO, a public <br />comment period on the proposed lists is scheduled to open on May 1 st. The public comment <br />period will close in July and final lists will be approved by the TARPO Technical Coordinating <br />and Transportation Advisory Committees. The B-G MPO schedule is yet to be determined. <br /> <br />SPOT P5.0 Project List <br />Over the past few years, substantial effort has been dedicated to scoping projects to ensure that <br />the maximum scores are obtained through the NCDOT prioritization process. As a reflection of <br />these efforts, the updated project maps and lists for the DCHC MPO, TARPO, and B-G MPO in <br />Orange County are provided in Attachment 3, Attachment 4, and Attachment 5, respectively. <br />Attachment 6 provides a list of projects carried over from the last NCDOT SPOT prioritization <br />process (P4.0). Planning efforts, e.g. the Orange County Comprehensive Transportation Plan <br />and the DCHC MPO Comprehensive Transportation Plan, among others, provide the basis for <br />all projects included on these draft project lists for submission to the P5.0 process. <br /> 10
The URL can be used to link to this page
Your browser does not support the video tag.