Browse
Search
OUTBoard agenda 020717
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 020717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:18:30 AM
Creation date
3/26/2018 10:17:54 AM
Metadata
Fields
Template:
BOCC
Date
2/7/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 021617
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />agreement provides a comprehensive county-wide system of utility service areas <br />upon which signatory entities could rely when making decisions related to issues <br />such as planning, land use, annexation, zoning, and growth management. <br />At its June 6, 2017 meeting, the BOCC approved amendments to the Water and <br />Sewer Management, Planning, and Boundary Agreement (WASMPBA) to expand the <br />Hillsborough Primary Service Area. All parties have since approved the WASMPBA <br />amendment, the Town of Hillsborough Board was the last party to approve in October <br />2017. Because of language included in the approval resolutions, the WASMPBA <br />amendment is to become effective when the joint land use plan is amended to reflect <br />the expanded Urban Service Area and assign a future land use classification. <br />With expansion of the Hillsborough Primary Service Area, the Town of <br />Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan (a.k.a <br />Joint Land Use Plan) must be amended to assign appropriate future land uses, <br />followed by an amendmentto the County Comprehensive Plan Future Land Use <br />Map.Following is a description of the two (2) planning constructs or “tools” that are <br />part ofthe proposed Hillsborough Economic Development areaexpansion: <br />The Town of Hillsborough/Orange County Central Orange Coordinated Area <br />(COCA) Land Use Plan is a joint land use document that defines the locations of <br />future land use categories to help achieve a desired and coordinated pattern of <br />development over time. The COCA Land Use Plan includes several urban-style <br />land use categories that are more specific than those provided in the County’s <br />Comprehensive Plan, which covers a much larger geographic area. <br />Implementation of the COCA Land Use Plan is achieved through consistency with <br />the County’s Comprehensive Plan Future Land UseMap, application of County <br />zoning, and a coordinated approach to rezoning. <br />The complete COCA Land Use Plan can be found on the Documents section of <br />the Planning Department’s web <br />page: http://www.orangecountync.gov/departments/planning_and_inspections/document <br />s.php <br />The Orange County Comprehensive Plan Future Land Use Map (FLUM) defines <br />the location of future land use categories, consistent with any joint land use plans, <br />and is designed to accommodate a particular combination of general land uses. <br />The FLUM helps achieve a desired pattern of development over time and is <br />implemented primarily through zoning. <br />The complete Comprehensive Plan can be found on the 2030 Comprehensive <br />Plan section of the Planning Department’s web page: <br />http://www.orangecountync.gov/departments/planning_and_inspections/2030_comprehe <br />nsive_plan.php <br />3.Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br />Objective ED-1.5: <br /> 21
The URL can be used to link to this page
Your browser does not support the video tag.