Orange County NC Website
TIP/WBS # Description Start/Let date Completion Date Status Cost Comments <br />R-5787B <br />44917.3.3 <br />Curb ramp improvements at various intersections in Orange and <br />Alamance Co. <br />Dec. 2016 Apr. 2017 Planning and design <br />activities underway. <br />$100,000 TAP, DMP <br />SS-4907BF <br />44271.1.FD1 <br />44271.2.1 <br />44271.3.1 <br />Radius and sight distance improvements at the intersection of SR <br />1567 (Pleasant Green Road) and SR 1569 (Cole Mill Road) in <br />Orange Co. <br />4/18/2016 10/28/2016 Clearing and grading <br />underway, Frontier utility <br />relocation completed <br />$15,000 PE <br />$80,000 R/W <br />$53,600 CON <br />State Spot Safety, R/W plans <br />received 7/8/15, Constr. By State <br />Forces <br />SS-4907BS <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and SR 1114 <br />(Buckhorn Road) East of Mebane. <br />Apr. 2017 Jun. 2017 Signal design underway. $40,500 R/W <br />$43,200 CON <br />State Spot Safety, Constr. By <br />State Forces, May need R/W <br />U-3306(L) <br />34913.3.2 <br />Landscaping on SR 1733 (Weaver Dairy Road) from NC 86 to SR <br />1734 (Erwin Road). <br />Dec. 2016 Spring 2017 Contract let pending $58,645 Project funding, Division let <br />U-5549/SS-4907AZ <br />50153.3.F1 <br />44227 <br />44247 <br />Churton Street Access Improvements - Traffic signal and curb ramp <br />revisions on east side of NC 86 (Churton Street) at SR 1150/SR <br />1002 (King Street), and NC 86 (Churton Street) at Margaret Street. <br />Grading, curb & gutter, crosswalks and signal modifications on the <br />west side of NC 86 /US 70 Bus.(Churton Street) from Tryon Street <br />to just south of Margaret Street. Grading, curb & gutter, crosswalk <br />and bus pull-out on NC 86 / US 70 Bus. (Churton Street) from south <br />of Margaret Street to just south of Nash and Koolock Street in <br />Hillsborough. <br />11/14/2016 Spring 2017 FHWA Construction <br />Authorization approved, No <br />bids received on Mar 17 let <br />and April 13 re-let. 3rd let <br />scheduled with floating <br />availability date <br />$156,000 CON <br />$245,000 CON <br />$120,000 CON <br />Spot Safety-State (ADA curb <br />ramp). Combine with Small <br />Construction, Contingency, STP- <br />DA. PCE approved Feb. 2015. <br />LAP - Town of Hillsborough, MA <br />executed <br />U-5550 <br />50154.3.FS1 <br />Intersection improvements at Fordham Boulevard (US15/501) and <br />Ephesus Church Rd. Improvements will include bike lanes and <br />sidewalks. <br />1/27/2016 Mar. 2017 Under construction - 40% <br />complete <br />$2,170,000 National Highway Performance <br />Program, LAP - Town of Chapel <br />Hill, MA executed <br />U-5846 <br />50236.1.1 <br />50236.2.1 <br />50236.3.1 <br />Construct a Roundabout at SR 1772 (Greensboro Street) and SR <br />1780 (Estes Drive) in Carrboro. <br />Jan. 2018 Mar. 2019 Planning and design <br />activities underway, R/W <br />plans complete Jan. 2017 <br />$775,000 STIP, P3.0, PEF-SEPI, Surveys <br />received 3/15, DMP, Public <br />meeting on Nov. 14 <br />U-5847 <br />50238.1.1 <br />50238.2.1 <br />50238.3.1 <br />Intersection improvements at SR 1010 (West Franklin St.) and SR <br />1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in Chapel Hill / <br />Carrboro. <br />Jan. 2019 Mar. 2019 Planning and design <br />activities underway, R/W <br />plans complete Jan. 2018 <br />$775,000 STIP, P3.0, PEF-STANTEC, <br />Surveys received, traffic forecast <br />and analysis complete, DMP <br />U-5854 <br />46382.1.1 <br />46328.2.1 <br />46382.3.1 <br />Construct a roundabout at SR 1008 (Mt. Carmel Church Road) and <br />SR 1913 (Bennett Road) in Chapel Hill <br />Jul. 2017 Oct. 2018 Planning and design <br />activities underway, R/W <br />plans complete October <br />2016, Public comments <br />have been received <br />$775,000 STIP, P3.0,PEF-SEPI, DMP <br />W-5707A <br />44853.1.1 <br />Curb ramp improvements for ADA compliance at the following <br />intersections: SR 2048 (South Road) at Raleigh Street; SR 2048 <br />(South Road) at Country Club Road, SR 1902 (Manning Drive) at <br />Paul Hardin Drive, and SR 1902 (Manning Drive) at Ridge Road / <br />Skipper Bowles Road in Chapel Hill <br />3/16/2017 5/1/17 Planning and design <br />activities underway. <br />$10,000 PE HSIP, DMP <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO <br />Item 6.a. <br /> 73