Browse
Search
OUTBoard agenda 011817
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2017
>
OUTBoard agenda 011817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 10:14:20 AM
Creation date
3/26/2018 10:07:42 AM
Metadata
Fields
Template:
BOCC
Date
1/18/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 011917
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ORANGE COUNTY <br />ORANGE UNIFIED TRANSPORTATION BOARD (OUTBoard) <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: January 18, 2017 <br /> Action Agenda <br /> Item No. 5.b. <br /> <br />SUBJECT: Safe Routes to School Plan Implementation Discussion <br /> <br />DEPARTMENT: Planning <br /> <br />ATTACHMENT(S): INFORMATION CONTACT: <br />1. SRTS Plan Update <br />2. Walkable Hillsborough Coalition <br />Presentation Notes <br />3. SRTS Plan (online link) <br />http://www.orangecountync.gov/document_cent <br />er/Transport/Adopted_Safe_Routes_to_School <br />__SRTS__Plan_AdoptedSRTSPlanallchapters. <br />pdf <br /> <br />Abigaile Pittman, Transportation/ <br />Land Use Planner, 245-2567 <br />Max Bushell, Transportation <br />Planner, 245-2579 <br /> <br /> <br /> <br />PURPOSE: Discussion of Safe Routes to School (SRTS) Plan implementation. <br /> <br />BACKGROUND: <br /> <br />At its September 21, 2016 meeting the OUTBoard received: <br /> A SRTS Plan Update (Attachment 1); and <br /> A presentation from representatives from the Walkable Hillsborough Coalition <br />regarding the group’s support for moving forward with identified SRTS Plan projects <br />associated with Grady Brown Elementary School and Cedar Ridge High School <br />(Attachment 2). The identified projects included: <br />o Sidewalks along Orange Grove Road from Churton Street to Grady Brown Road; <br />and <br />o Pursuing a local match for Federal funding and clearly identifying preliminary <br />critical path steps. <br /> <br />Discussions with the OUTBoard also addressed other related projects: <br /> Improving safety on the bridge with side fencing (in lieu of a complete bridge <br />replacement or pedestrian retrofit accommodation); and <br /> Crosswalks on Grady Brown Road and on Orange Grove Road over to Oakdale <br />Drive. <br /> <br /> 65
The URL can be used to link to this page
Your browser does not support the video tag.