Orange County NC Website
Main Table <br />(continued) <br />•2040 volume and volume/capacity <br />(i.e., congestion level) •Projected future cross-section. Abides by <br />Complete Streets. Remember: <br />environmental process determines ultimate <br />cross-section design. Other <br />•Problem statements – Eight Full and thirty-one minimum <br />statements; explains why improvements are needed <br />•Unaddressed needs – explains why roadway that is over <br />capacity does not have improvements designated