Browse
Search
2018-099-E AMS - Longent WCOB Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-099-E AMS - Longent WCOB Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:30:06 PM
Creation date
3/26/2018 8:58:26 AM
Metadata
Fields
Template:
Contract
Date
3/19/2018
Contract Starting Date
3/6/2018
Contract Ending Date
5/31/2018
Contract Document Type
Agreement - Services
Amount
$11,750.37
Document Relationships
R 2018-099 AMS - Longent_WCOB_Contract
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1E2AAD35 -CBEC- 4533- B8C2- A8D2EEC354B4 <br />LJ0NC7ENT <br />7250 ACC Blvd, Raleigh, NC 27617 919.896.7298 <br />Date: 7- Mar -18 <br />Longent offers this quotation to the following Purchaser: <br />Purchaser: Orange County <br />Site Name: Orange County Hillsborough LTE Upgrade Q <br />Site Address: 131 Margaret Lane <br />Hillsborough <br />Attn: Allison Cooper <br />Quotation No.: <br />18947069 <br />Version # <br />2 <br />Version Date: <br />3/7/2018 <br />Prepared By: <br />Jacob Roberson <br />Purchaser Contact Information: <br />Phone: <br />Finail- arnnnpr(a�nrannernuntvnr.. nnv <br />Scope of Work: <br />Adding Verizon 2100MHz LTE to existing DAS system. <br />Pricing Proposal <br />I <br />Total Active Components <br />$ 3,682.87 <br />2 <br />Total Repeater Components <br />$ - <br />3 <br />Total Passive Components <br />$ 1,616.08 <br />4 <br />Total Battery Back -Up 24 hours <br />$ - <br />5 <br />Engineering Services <br />$ 3,055.02 <br />6 <br />Project Management <br />$ - <br />7 <br />Installation Services <br />$ 2,641.87 <br />8 <br />9 <br />10 <br />11 <br />12 <br />Maintenance and Monitoring <br />NIA <br />$ - <br />Tax <br />$ 595.56 <br />Freight <br />$ 158.97 <br />Total Cost <br />$ 11,750.37 <br />Quotation Terms and and Assumptions <br />STANDARD LEAD TIME <br />6 weeks ARO <br />SHIPPING TERMS <br />Prepay and Add — Standard FedEx Service <br />PAYMENT TERMS <br />Net thirty 30 days from Date of Invoice <br />F.O.B. <br />Raleigh, NC <br />WARRANTY <br />12 months from date of completion, labor only <br />REMARKS <br />Quotation valid for 30 days from Quotation Date <br />CONTRACTING LICENSE # <br />27285 -U STATE: NC <br />FREQUENCY RADIO NUMBER <br />008003675 <br />ASSUMPTIONS <br />The quotation is based on the scope of work and drawings provided by the Customer. <br />Union labor and /or asbestos monitoring /abatement are not required nor included in the installation quotation. <br />The facility has built -in ladders /stairs for accessing the roof and pulley /mechanical lift will be provided to place materials on roof. <br />Tenting /HEPA carts, mechanical lift, nor ladders in excess of 10' are not required during install. <br />Freight elevator service will be available to all levels and all proposed cable paths are accessible via drop ceiling tiles, crawl space, <br />or access panels. <br />End user owned systems require approval by the applicable wireless operator and a retransmission agreement. <br />Any cancelled PO's are subject to 10% equipment restocking fee. <br />Any unreturnable equipment due to cancelled PO will be invoiced at full cost. <br />Roof penetrations for donor lines and horizontal fire wall penetrations are in place and are not included in this quotation. <br />Customer will coordinate implementation approval from the Facility Owner. <br />Assumes Longent will not be held responsible for PIM external to the DAS and /or preexisting non -PIM rated installation. <br />Installation services will be conducted during normal business hours (8 am to 5 pm, Monday through Friday). <br />Assumes building can provide dedicated 75Mbps Downlink and 25Mbps Uplink connection on separate circuit. <br />Dry contacts will be available for Fire Alarm interface per IFC section 510- Any additional contacts will result in a change order <br />Patching and painting not included in quotation- assumes access panels will be available for access to ceiling <br />As- builts and submittal package including benchmark results will be provided to owner at completion of project <br />A mechanical lift is not needed or will be available for usage <br />Phasing not included in quotation- any additional phasing requirements will result in a change order <br />Respectfully submitted: <br />Longen.tZZC <br />31712018 <br />Company <br />Date <br />LONGENT <br />PROPRIETARY AND CONFIDENTIAL <br />May not be distributed without written consent of Longent LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.