Browse
Search
2018-095-E AMS - Pickard Roofing Gutter Repair BOE
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-095-E AMS - Pickard Roofing Gutter Repair BOE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:28:47 PM
Creation date
3/22/2018 9:23:05 AM
Metadata
Fields
Template:
Contract
Date
3/26/2018
Contract Starting Date
3/26/2018
Contract Ending Date
6/30/2018
Contract Document Type
Agreement - Construction
Amount
$1,613.00
Document Relationships
R 2018-095 AMS - Pickard Roofing Gutter Repair BOE
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 50EA492A- 260E -483C- 8122- 82BDB8495921 <br />Page 1 of 2 <br />'41� <br />C ARo <br />ROOFING COMPANY, INC. <br />January 11, 2018 <br />Orange County Asset Management Services <br />Angel Barnes, <br />131 West Margaret Lane <br />Hillsborough, NC 27278 <br />REF: <br />208 S. Cameron Street. Board of Elections Building. <br />Dear Angel, <br />Following my site inspection of the building, we propose the following for your consideration: <br />Due to the nature of this work, we will perform at our T &M of $125.00 /hr not to exceed <br />$1,500.00 + applicable tax. <br />Disconnect 3 downspouts from the gutter (one at the East elevation and two at the South <br />elevation). Shorten above mention downspouts an inch or so on each one to allow for the gutter <br />to be lowered enough for better drainage. <br />The gutter being anchored with H.R. Rival Strap Hangers will prevent us from modifying the <br />existing slope of it but we will do our best to readjust it as much as possible. <br />Payment in full is due at completion of project, or as a percentage of completion every two (2) <br />weeks, whichever comes first. Any active account that is over ten (10) days past due will accrue <br />a late charge of .05% per day. <br />Pickard Roofing Co. Inc. carries liability and workers compensation insurance in order to protect <br />the customer and our company. Certificates of insurance are available upon request. <br />Frank Meunier <br />Sheet Metal Estimator <br />Cell # 919 - 407 -0288 <br />Office # 919 - 682 -5702 <br />frankkpickardroofing com <br />
The URL can be used to link to this page
Your browser does not support the video tag.