Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />1. Form of Contract <br />2. General Conditions and Supplemental Conditions <br />3. Specifications <br />4. Shop Drawings /Submittals <br />5. Drawings <br />a) Large Scale Details <br />b) Small Scale Details <br />c) Plan Views <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />B. The wording of the specifications shall be interpreted in accordance with common usage <br />of the language except words having a common used technique or trade meaning shall be <br />so interpreted in preference to other meanings. <br />1.06 Codes and Standards <br />Whenever reference is given to codes or standard specifications, or other data published by <br />regulating agencies or accepted organizations including but not limited to State of North Carolina <br />Building Code, Federal Specifications, ASTM Specifications, Underwriters' Laboratories, <br />various institute specifications and the like, it shall be understood that such reference is to the <br />latest edition, including addenda, published prior to the date of the specifications. <br />1.07 Use of Premises and Removal of Debris <br />A. Traffic ways to the building shall be kept clear and open at all times. Noise and dirt shall <br />be kept to a minimum. All dirt and debris shall be promptly cleaned up and properly <br />disposed of. <br />B. Whenever the Contractor finds it necessary to shut off any services or utilities to any <br />portion of the building, the Owner shall be notified a minimum of 48 hours in advance to <br />arrange the shutdown of such services or utilities to occur at a time convenient to the <br />Owner. <br />C. Parking of Contractor vehicles on site shall be in accordance with Town of Clayton <br />policy. <br />1.08 Protection of Persons and Property <br />The Contractor shall immediately report to the Owner's Representative by telephone all <br />accidents, near accidents, and fires on the project resulting in injury, damage, or death, and <br />subsequently confirm by letter. This in no way relieves the Contractor from making reports <br />required by law. <br />PART 2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />Not Used <br />17 -198 <br />END OF SECTION <br />010050 -2 <br />Special Conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.