Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 010050 <br />SPECIAL CONDITIONS <br />PART GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General, Supplemental, and Special <br />Conditions and other Division 1 specification sections may apply to work of this section. <br />1.02 Asbestos - Materials containing asbestos or Canadian fibers in any form shall not be used on this <br />project. <br />1.03 Means and Methods <br />A. The Contractor shall employ such methods and appliances for performance of all <br />operations connected with work as will be required to secure a satisfactory quality of <br />work and rate of progress agreed upon. <br />B. If at any time methods or appliances appear to be inefficient or inappropriate, the <br />Designer may order the Contractor to improve its methods and/or improve or expand its <br />appliances; and the Contractor must conform to such order. Failure of the Designer to <br />demand such increase in efficiency or improvement shall not release Contractor from any <br />of its several obligations. <br />1.04 Owner's Designated Representative <br />Owner's Representative shall be: <br />Angel Barnes <br />Orange County Asset Managements <br />131 West Margaret Lane <br />Hillsborough, North Carolina 27278 <br />Phone: 919/245 -2628 <br />Designer of Record: <br />5thWall Building Diagnostics Consultants <br />9601 Baileywick Rd <br />Raleigh, North Carolina 27615 <br />Phone: 919/616 -4715 <br />1.05 Intent of Documents <br />A. The intent of the Documents is to include all labor, material, transportation, equipment, <br />and all other items necessary to perform and maintain a complete project. In case of <br />discrepancy or disagreement in the Documents the order of preference shall be: <br />17 -198 Special Conditions <br />010050-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.