Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />XIIL MODIFICATIONS TO ARTICLE 14 - TERMINATION OR SUSPENSION OF THE <br />CONTRACT <br />A. Paragraph 14.1 "TERMINATION BY THE CONTRACTOR" <br />1. Delete Clause 14.1.1.4 in its entirety. <br />B. Paragraph 14.2 "TERMINATION BY THE OWNER FOR CAUSE" <br />1. In Subparagraph 14.2.2, in the first sentence delete the words "upon certification <br />by the Architect that sufficient cause exists to justify such action" and insert in its <br />stead the following language: "after consultation with the Architect ". <br />C. Subparagraph 14.4.1 "TERMINATION BY THE OWNER FOR CONVENIENCE" <br />After the phrase "terminate the contract, ", add the words "in whole or in part." <br />D. Delete Subparagraph 14.4.3 in its entirety and substitute in instead the following new <br />Subparagraph 14.4.3: <br />14.4.3 In case of such termination for the Owner's convenience, the Contractor shall be <br />entitled to receive payment for Work executed, and costs incurred by reason of <br />such termination, along with an equitable portion of the Contractor's fee based <br />on the portion of the Work completed. <br />SGC - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.