Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />Leave the entire construction site clean and ready for occupancy." <br />2. Delete Subparagraph 3.15.2 and insert in its stead the following new <br />Subparagraph 3.15.2: <br />3.15.2 If the Contractor fails to clean up during construction or at the completion <br />of the Work, the Owner may do so as provided in Paragraph 2.4 and the cost <br />thereof shall be charged to the Contractor. <br />I. Paragraph 3.18 "INDEMNIFICATION" <br />Revise Subparagraph 3.18.1 by deleting from the first sentence the words: "...and <br />to the extent claims, damages, losses or expenses are not covered by Project <br />Management Protective Liability insurance purchased by the Contractor in <br />accordance with Paragraph 11.3,... ". <br />2. Add a new Subparagraph 3.18.3 as follows: <br />3.18.3 As a condition of payment by the Owner of Contractor's Applications for <br />Payment, the Contractor shall further indemnify and hold harmless the Owner <br />and its sureties and Architect from any claims, damages, loss or expense, <br />including Owner's attorney fees, relating to or on account of any lien or claim of <br />lien asserted by any laborer, materialman, subcontractor or any other person <br />directly or indirectly acting for, through, or under Contractor against the Project <br />or any part thereof or any interest therein or against monies due or to become due <br />from Owner, its sureties or agents; without limiting the foregoing, Contractor <br />shall cause any lien or claim of lien to be removed, satisfied, or discharged within <br />10 days from the date of filing or receipt by the Contractor, whichever is sooner. <br />V. MODIFICATIONS OF ARTICLE 4 - ADMINISTRATION OF THE CONTRACT <br />A. Paragraph 4.2 "ARCHITECT'S ADMINISTRATION OF THE CONTRACT" <br />Delete Subparagraph 4.2.2 in its entirety and insert in its stead the following new <br />Subparagraph 4.2.2: <br />4.2.2 The Architect will visit the site at intervals appropriate to the stage of <br />construction to become familiar with the progress and quality of the completed <br />Work and to determine in his professional opinion whether the Work is being <br />performed in a manner indicating that the Work, when completed, will be in <br />accordance with the Contract Documents. On the basis of on -site observations as <br />an architect, the Architect will keep the Owner informed of progress of the Work <br />and will endeavor to guard the Owner against defects and deficiencies in the <br />Work. The Architect will neither have control over or charge of, nor be <br />responsible for, the construction means, methods, techniques, sequences or <br />procedures, or for the safety precautions and programs in connection with the <br />Work, since these are solely the Contractor's rights and responsibilities under the <br />Contract Documents, except as provided in Subparagraph 3.3.1. <br />2. At the end of Subparagraph 4.2.3 insert the following: "Nothing in this <br />Paragraph, however, affects the obligation of the Architect to review the progress <br />of the Work with sufficient frequency and detail to fulfill the obligations set out <br />in Subparagraph 4.2.2 above and to form a professional opinion as to the amount <br />SGC -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.