Orange County NC Website
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />3.6.5 Sales or use tax paid on purchase or rental of tools and equipment used by <br />any prime contractor and/or Subcontractor shall be included in the Contract Sum <br />and will not be reimbursable. <br />3.6.6 Sales or use tax on materials furnished under change orders will be <br />reported by the same methods as outlined above for material furnished under the <br />original contract. Therefore, sales or use tax, except of the type described in <br />Subparagraph 3.6.5, shall not appear in the cost breakdown of change orders. <br />E. Paragraph 3.10 "CONTRACTOR'S CONSTRUCTION SCHEDULES" <br />Add to Subparagraph 3. 10.1 the following: <br />"Within ten days after award of the Contract the Contractor shall submit to the <br />Architect and Owner a chart showing the estimated progress for the component <br />divisions of the Work, together with a composite curve showing the estimated <br />progress for the entire Work under this Contract." <br />3.10.1.1 The chart will indicate the percent of the total construction cost for each <br />item listed and list further breakdown of items shown specification section) to <br />provide a separate item for each Work unit. <br />3.10.1.2 The Schedule of Values required by Subparagraph 9.2.1 is to be plotted <br />against the project time of the project to show "Anticipated Monthly Values" and <br />"Accumulated Scheduled Progress ". Such consolidation shall not amend the <br />requirements of 9.2.1. <br />3.10.1.3 This chart must be approved by the Architect and Owner, but only for <br />the limited purpose of determining that the time limits per the Contract <br />Documents have not been exceeded, that the major components of the Work have <br />been included and that the chart complies with items 1 and 2 above. Such limited <br />approval in no way constitutes an acceptance of any variation of the schedules <br />required in the Contract Documents. <br />3.10.1.4 The chart shall be updated at least on a monthly basis to accurately <br />assess the progress of the Work. The Contractor shall submit a narrative report <br />to include, but not be limited to, a description of problem areas, current or <br />anticipated delaying factors and their impact, and an explanation of corrective <br />action taken or proposed. <br />F. Paragraph 3.11 "DOCUMENTS AND SAMPLES AT THE SITE" <br />Insert at the end of Subparagraph 3.11.1 the following: <br />3.11.1.1 As the Work proceeds, the Contractor shall keep a careful record of <br />mechanical, electrical, underground and other concealed Work whose final <br />in -place locations vary from those shown on the Contract Drawings, whether <br />because of Change Orders or actual job conditions. <br />3.11.1.2 All such variations shall be shown on the Field Documents which shall <br />be delivered to the Architect before final payment is processed. This copy shall <br />be known as the "Record Drawings" and shall be used for no other purpose than <br />to record changes from the Contract Documents incorporated in the finished <br />SGC -5 <br />