Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />IV. MODIFICATIONS OF ARTICLE 3 - CONTRACTOR <br />A. Paragraph 3.2 "REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS <br />BY CONTRACTOR" <br />1. In Subparagraph 3.2.1, in the last sentence, the phrase "...shall be reported promptly <br />to the Architect..." is revised to read "...shall be reported promptly to the Owner and <br />to the Architect...." <br />2. In Subparagraph 3.2.2, in the last sentence, the phrase "...shall be reported promptly <br />to the Architect." is revised to read "...shall be reported promptly to the Owner and to <br />the Architect." <br />B. Paragraph 3.3 "SUPERVISION AND CONSTRUCTION PROCEDURES" <br />1. The next to last sentence is deleted and restated as follows: <br />"If the Contractor determines that such means, methods, techniques, sequences or <br />procedures may not be safe, the Contractor shall give timely written notice to the Owner <br />and Architect and shall not proceed with that portion of the Work without further written <br />instructions from the Owner." <br />C. Subparagraph 3.4.2 is revised by adding the following sentence: <br />"The Owner shall respond to recommended changes within 7 calendar days after receipt of <br />the written evaluation of the Architect." <br />D. Paragraph 3.5 "WARRANTY" <br />In Subparagraph 3.5.1, delete the last sentence and insert in its stead the <br />following: "If requested by the Architect or Owner, the Contractor shall furnish <br />to the requesting party satisfactory evidence as to the kind and quality of <br />materials and equipment." <br />E. Paragraph 3.6 "TAXES" <br />In Subparagraph 3.6.1 delete the period at the end of Subparagraph 3.6.1 and add <br />the words "except as otherwise specified ". <br />2. Add the following Subparagraphs as set forth below: <br />3.6.2 The proposal sum of each bidder shall include North Carolina Sales Tax. <br />3.6.3 The Contractor shall list and provide a total of sales taxes paid during each <br />month by County of North Carolina on a form to be furnished by the Owner. <br />Such listings shall include sales taxes paid by the Contractor and his <br />Subcontractors and shall be submitted along with each monthly request for <br />payment. <br />3.6.4 In those instances where a Contractor purchases materials from a <br />Subcontractor and/or materials made for use in construction work for the Owner <br />and pays sales or use tax on such materials, he shall report monthly the amount of <br />sales tax paid by the firm names and amounts and enter on the sales tax form. <br />SGC - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.