Orange County NC Website
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />Contract Specifications or as to Change Orders, on the date of the <br />Change Order. These publications are hereby made a part of the <br />Specifications as though repeated therein in full and all manufactured <br />articles, materials and equipment shall be applied, installed, erected, <br />connected, used, cleaned, and conditioned accordingly, unless <br />specified to the contrary. If the manufacturer's specifications and <br />other Contract Documents are at variance with one another, the more <br />stringent or demanding requirement or specification shall govern the <br />way the work is performed or installed. <br />14. All publications referred to for the establishment of material or <br />construction standards shall include the latest revisions in effect on <br />the date of the Contract Specifications. <br />Add new Subparagraphs 1.1.9, 1.1.10, and 1.1.11 as follows: <br />1.1.9 NUMBER OF SPECIFIED ITEMS REQUIRED. <br />Wherever an article, device or piece of equipment is referred to in the singular <br />number, such reference shall apply to as many such articles as are shown on the <br />Contract Documents or required to complete the installation. <br />1.1.10 EQUIPMENT FURNISHED BY OTHERS. <br />For all equipment furnished by others, to be installed by the Contractor, the <br />Contractor shall use manufacturer's detail drawings to establish rough -in <br />dimensions and location of services. h1 case of conflict, equipment detail <br />drawings and dimensions shall be used, except where aesthetic or structural <br />considerations make an adjustment necessary. <br />See attached addendum for any other definitions and abbreviations required for a specific project, <br />which are incorporated herein by reference. <br />In the event of conflict or discrepancies in the Contract Documents, priority of <br />interpretation shall be: <br />1. Owner- Contractor Agreement <br />2. Addenda (later date takes precedence) <br />3. Instructions to Bidders <br />4. Supplementary General Conditions <br />5. General Conditions <br />6. Specifications <br />7. Architectural drawings <br />8. For all drawings <br />a. Schedules <br />b. Notes <br />c. Typical details <br />d. Large scale details <br />e. Small scale details <br />B. Paragraph 1.2.1, the next to the last word, "indicated" is changed to "intended." <br />C. Paragraph 1.5.1 is deleted and restated as follows: <br />"1.5.1 The Contract shall be signed by the Owner and Contractor." <br />SGC - 2 <br />