Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />Contract Specifications or as to Change Orders, on the date of the <br />Change Order. These publications are hereby made a part of the <br />Specifications as though repeated therein in full and all manufactured <br />articles, materials and equipment shall be applied, installed, erected, <br />connected, used, cleaned, and conditioned accordingly, unless <br />specified to the contrary. If the manufacturer's specifications and <br />other Contract Documents are at variance with one another, the more <br />stringent or demanding requirement or specification shall govern the <br />way the work is performed or installed. <br />14. All publications referred to for the establishment of material or <br />construction standards shall include the latest revisions in effect on <br />the date of the Contract Specifications. <br />Add new Subparagraphs 1.1.9, 1.1.10, and 1.1.11 as follows: <br />1.1.9 NUMBER OF SPECIFIED ITEMS REQUIRED. <br />Wherever an article, device or piece of equipment is referred to in the singular <br />number, such reference shall apply to as many such articles as are shown on the <br />Contract Documents or required to complete the installation. <br />1.1.10 EQUIPMENT FURNISHED BY OTHERS. <br />For all equipment furnished by others, to be installed by the Contractor, the <br />Contractor shall use manufacturer's detail drawings to establish rough -in <br />dimensions and location of services. h1 case of conflict, equipment detail <br />drawings and dimensions shall be used, except where aesthetic or structural <br />considerations make an adjustment necessary. <br />See attached addendum for any other definitions and abbreviations required for a specific project, <br />which are incorporated herein by reference. <br />In the event of conflict or discrepancies in the Contract Documents, priority of <br />interpretation shall be: <br />1. Owner- Contractor Agreement <br />2. Addenda (later date takes precedence) <br />3. Instructions to Bidders <br />4. Supplementary General Conditions <br />5. General Conditions <br />6. Specifications <br />7. Architectural drawings <br />8. For all drawings <br />a. Schedules <br />b. Notes <br />c. Typical details <br />d. Large scale details <br />e. Small scale details <br />B. Paragraph 1.2.1, the next to the last word, "indicated" is changed to "intended." <br />C. Paragraph 1.5.1 is deleted and restated as follows: <br />"1.5.1 The Contract shall be signed by the Owner and Contractor." <br />SGC - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.