Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />S f ate Roof Replacement <br />Orange County Skills Development Center, Chapel Hill, NC <br />RFP # 1728 <br />Work Items <br />A. <br />Remove and dispose of existing slate roof to include <br />PROPOSAL FORM <br />$ 4,000.00 <br />General Items <br />B. <br />Replacement of deteriorated wood deck <br />A. <br />Insurance <br />Lump Sum (L.S.) <br />$ <br />NO EXTRA CHARGE <br />B. <br />Bonds <br />L.S. <br />$ <br />NIA <br />C. <br />Mobilization <br />L.S. <br />$ <br />NO EXTRA CHARGE <br />D. <br />Warranty <br />L.S. <br />$ <br />NO EXTRA CHARGE <br />L.S. <br />$ 43,500.00 <br />Subtotal -- General Items L.S. <br />$ <br />0 <br />Work Items <br />A. <br />Remove and dispose of existing slate roof to include <br />L.S. <br />$ 4,000.00 <br />underlayment and related accessories <br />B. <br />Replacement of deteriorated wood deck <br />L.S. <br />$ 500 <br />Allow $500 in Base Bid $ 10.00 /Sq. Ft. <br />C. <br />Remove and replace damaged or deteriorated wood <br />L.S. <br />$ 500 <br />Allow $ 500 in Base Bid $ ia&o /Bd. Ft. <br />D. <br />Furnish and install membrane underlayment <br />L.S. <br />$ 2,650.00 <br />E. <br />Furnish and install slate roofing to include <br />L.S. <br />$ 43,500.00 <br />all flasliings and related accessories <br />SF'T, DISCOUNT PRICING <br />" I3aackingli aaaa Sl :Ite will be used' "'`* <br />-O <br />F. <br />Furnish and install new sheet metal flashing to include <br />) , <br />$ 3,650.00 <br />counterflashing, edging, gutter, trim, etc <br />G. <br />Furnish and install other items not specifically included <br />L.S. <br />$_ N/A <br />or listed herein <br />Subtotal — Work Items <br />L.S. <br />$ 54,8000.00 <br />Total Price North Building --- (General Items and Work Items) L.S. $ 54,800.00 <br />TOTAL BID PRICE: Bidder agrees to perform all of the work described in the specifications and shown <br />on the plans for the sum of <br />THIRTY THREE THOUSAND AND FIFTY DOLLAR_ S ( $54,800.00 ) <br />(A nount shall be shown in both words and .figures.) <br />St"EC[At, DISCOUNTS: <br />AILT.t;,10ATE #I- <br />trwc= cold(I install Evergreen Vermont Black Slate in Liam of Buckingham DEDUCT: (46,450.00) <br />ALTERNA l"E 02 <br />If we could install Dover Unl ading lit ick Slate In .Lieal cat" Buckingb aan DEDUCT: (- $11,545.00) <br />-"Specifications can be provided-Dover slate is similar to Buckinglinna taa both too]( and physical <br />elasai•aeteristies. 'Fes till g data call be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.