Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />D. Form sections square, true, and accurate to size, free from distortion, sharp edges, and <br />other defects detrimental to appearance or performance. Shop fabricate sheet metal <br />sections to the maximum extent possible. <br />E. Junctures, intersections, corners and unions of sheet metal shall be fabricated from one <br />piece with minimum 18 -inch legs; legs shall not be longer than 24 inches. Seam corners <br />for rigidity, seal with sealant. <br />F. Fabricate vertical faces with bottom edge formed outward 5/8 inch and hemmed to form <br />drip. <br />G. At all locations where new sheet metal sections abut walls, copings, or terminate, the <br />sheet metal flashings shall terminate with end sections of one -piece construction to <br />provide watertight seams. Seams shall be sealed; seams of copper or stainless steel shall <br />be soldered. <br />H. Sheet metal flashings shall be fabricated and installed to allow for expansion and <br />contraction of the component materials without buckling, hole elongation, fastener <br />failure, or excess stress loading situations developing at any time during the temperature <br />cycle. Clips shall be designed and installed to resist rotation and to avoid shear stress <br />when roofing materials expand and contract. Flashing shall not be installed across <br />expansion joints. <br />PART 3 EXECUTION <br />3.01 Inspection <br />A. Inspect nailer areas to verify that they are clean, smooth, and free of depressions, waves, <br />or projections and solidly supported over joints. <br />B. Verify that roof openings, pipes, sleeves or vents through roof are solidly set. <br />C. Verify compatibility of flashing system with other system materials. <br />D. Verify installation of all appropriate baseflashings prior to installation of sheet metal. <br />E. Verify existing field conditions. Minor dimensional detail changes may be required to fit <br />existing conditions. <br />3.02 Installation- General <br />A. Dissimilar metals shall be kept separated to prevent galvanic action. Preventive measures <br />shall include separation by suitable bituminous paint. <br />B. Where bituminous materials are to be applied to sheet metal, the flanges shall first be <br />primed with an asphaltic primer. The primer shall be interrupted where caulking is to be <br />applied. <br />C. All metal flanges shall be installed on top of membrane and set in a full bed of sealant. <br />D. Flanges of edge metal shall terminate 1/2 inch from roof -side edge of nailer. <br />17 -198 Sheet Metal Flashing and Trim <br />076200 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.