Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />L. Install copper step flashing, valleys, and trim flashing in conjunction with slate roofing. <br />M. Nail holes that must be field punched shall be punched from the back of the slate so as to <br />provide proper countersinking of the fastener. <br />N. All slate shall be cut from the back side so as to produce the proper orientation of the <br />beveled edge. <br />3.06 Valleys <br />A. At valleys, slate shall be installed to result in open valleys. The width of the valley shall <br />taper from top to bottom at the rate of 1/2 inch in 10 feet (1/4 inch in 10 feet on each side of <br />valley). <br />B. Width of the valley at the top shall be 2 inches minimum. Slate shall overlap metal valley a <br />minimum of 6 inches. <br />3.07 Repair <br />A. Upon completion, all slate shall be sound, whole, clean, and the roof left in every respect <br />tight. <br />B. No slate with a broken corner larger than 2 inches by 2 inches shall remain in the finished <br />roof. Repairs shall be performed using the "Bib" method ( "Slate Hook" method may be <br />substituted). <br />END OF SECTION <br />17 -198 Slate Roofing <br />073300.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.