Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />DIVISION 7 <br />THERMAL AND MOISTURE PROTECTION <br />SECTION 073300 <br />SLATE ROOFING <br />PART1 GENERAL <br />1.01 Related Documents <br />Drawings and general provisions of the contract including General, Supplemental and Special <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Work Included <br />A. Installation of self - adhering membrane underlayment over existing deck. <br />B. Installation of eave and ice dam protection. <br />C. Installation of self - adhering membrane at selected locations including but not necessarily <br />limited to hips, ridges, valleys, rakes, perimeters, and projections. <br />D. Installation of copper step flashing at sloped intersections of slate roofs and walls. <br />E. Installation of new slate roofing. <br />F. Installation of snow and ice guards at selected locations. <br />1.03 Related Work <br />A. Section 024119 — Selective Demolition <br />B. Section 076200 — Sheet Metal Flashing and Trim <br />1.04 Submittals <br />Submittals shall be in accordance with this specification. <br />A. Submit the following as a minimum: <br />1. Three (3) full size samples of slate. <br />2. Three (3) samples of each gauge of nail to be used for each detail. <br />3. Three (3) samples of each proposed snow guard. <br />4. Manufacturer's data sheet for all materials. <br />5. Descriptive list of all materials proposed for use. <br />B. Submit shop drawings including but not necessarily limited to: <br />1. Roof assembly including underlayment. <br />2. Slate installation at intersection with chimneys. <br />3. Slate installation at intersection at valleys and eaves. <br />4. Slate installation at gutters. <br />17 -198 Slate Roofing <br />073300.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.