Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />DIVISION 6 <br />WOOD, PLASTICS AND COMPOSITES <br />SECTION 061000 <br />ROUGH CARPENTRY <br />PART1 GENERAL <br />1.01 Related Documents <br />Drawings and general provisions of the contract including General, Supplemental and Special <br />Conditions, and other Division 1 specification sections apply to work of this section. <br />1.02 Work Included <br />A. Repair of damaged or deterioraed wood deck <br />B. Replacement of damaged or deteriorated wood nailers and blocking. <br />1.03 Related Work <br />A. Section 024119 — Selective Demolition <br />B. Section 073300 — Slate Roofing <br />C. Section 076200 — Sheet Metal Flashing and Trim <br />1.04 Environmental Conditions <br />Material installation shall proceed only when weather conditions are in compliance with the <br />manufacturer's recommendations for installation and no precipitation is imminent. Materials <br />installed during adverse weather conditions shall be subject to rejection including removal and <br />replacement. <br />1.05 Quality Assurance <br />A. Provide sufficient qualified workmen and supervisors who shall be present at all times <br />during execution of this portion of the work and who shall be familiar with the type of <br />construction involved and the materials and techniques specified. <br />B. The Owner shall make no allowance for lack of skill of the workmen. <br />1.06 Submittals <br />A. Product Data: For each type of process and factory- fabricated product. Indicate <br />component materials and dimensions and include construction and application details. <br />B. Structural Composite Lumber: Submit manufacturer's published structural data including <br />span tables, marked to indicate which sizes and grades are being used; if structural <br />composite lumber is being substituted for dimension lumber or timbers, submit grading <br />agency structural tables marked for comparison. <br />C. Include data for wood - preservative treatment from chemical treatment manufacturer and <br />certification by treating plant that treated materials comply with requirements. Indicate <br />type of preservative used and net amount of preservative retained. <br />17 -198 Rough Carpentry <br />061000 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.