Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />H. Final payment will be made to the Contractor only after three signed and notarized copies <br />of the warranties and guarantees have been submitted and the membrane manufacturer <br />acknowledges that all bills are paid. All such documents shall show the project name, <br />project number, and location and the Owner's name. <br />I. All new materials and workmanship covering work provided under Section 076200 Sheet <br />Metal Flashing and Trim shall be guaranteed in writing by the Contractor to be in a <br />watertight condition for a period of five years after date of final payment. <br />The effective date of all warranties shall be the same and shall be on the date of the last <br />final inspection when the Owner, Designer, Contractor and Manufacturer agree that all <br />work has been completed in substantial compliance with the plans and specifications. <br />K. Contractor shall post 8 1/2" X 11" signs provided by the Owner on the building in <br />locations as directed by the Owner identifying components of the roof system, the date of <br />project final completion, the duration of the warranty and standard information and <br />limitations of warranty provided. <br />PART2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />Not Used <br />END OF SECTION <br />17 -198 Warranties <br />017850.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.