Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 017850 <br />WARRANTIES <br />PART1 GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General, Supplemental, and Special <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Related Sections <br />A. Section 061000 — Rough Carpentry <br />B. Section 073300 — Slate Roofing <br />C. Section 076200 — Sheet Metal Flashing and Trim <br />D. Section 079200 — Sealants & Caulking <br />1.03 Description of Work <br />Provide Warranties to Owner with Close -Out documents for the sections noted in paragraph 1.02. <br />1.04 Upon completion of the work and prior to final payment, the Contractor shall submit the <br />following items to the Designer: <br />A. Copies of all punchlists to include materials' manufacturer's and Designer's punchlists, <br />and documentation of completion. <br />B. Manufacturer's report that the project has been inspected and is suitable for warranty. <br />C. Manufacturer's special warranty to Owner. <br />D. Contractor's warranty to Owner. <br />1.05 Submit all items required by this section as a part of Section 017839, Project Record Documents. <br />1.06 Install placards denoting roof and warranty information. Placards shall be provided by the <br />Contractor. Placards to be permanently mounted at all locations of egress to the roof. <br />1.07 Warranties <br />A. Comply with the General Conditions and Supplemental Conditions of the Contract <br />concerning warranties and bonds. Contractor shall agree that the work covered under this <br />contract shall remain free from any water penetration and physical defects caused by <br />defective workmanship including installation for a period as noted below from the date of <br />final acceptance by the Owner. <br />17 -198 Warranties <br />017850.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.