DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />3. The time to be allowed for Contractor to complete or correct listed items. <br />4. Time and date Owner will assume possession of the work or designated portion <br />thereof. <br />Signature of Designer and Contractor. <br />E. Contractor shall then complete or correct those items so listed within the designated time and <br />inform the Owner and Designer upon completion. <br />F. Should the Owner and Designer determine that the work is not substantially complete the <br />Designer shall immediately notify the Contractor in writing stating the reasons. Contractor <br />shall then complete the work and send a second written notice to the Designer certifying that <br />the project or designated portion thereof, is substantially complete. The Designer shall re- <br />inspect the work within seven days after receipt of certification. <br />3.02 Final Inspection <br />A. Contractor shall: Submit written certification to the Designer that: <br />1. The contract documents have been reviewed. <br />2. Work has been completed in accordance with the contract documents. <br />3. The project has been inspected for compliance with the contract documents. <br />4. The project is ready for final inspection. <br />B. Provide safe access to all areas of the facility to accommodate personnel for the final <br />inspection. <br />C. The Designer shall make a final inspection within ten days after receipt of certification. <br />D. Should the Designer determine that the work is finally complete in accordance with the <br />requirements of the contract documents, the Designer shall request that the Contractor <br />submit the appropriate project close -out documentation. <br />E. Should the Designer determine that the work is not finally complete, the Designer shall <br />immediately notify the Contractor in writing stating reasons. The Contractor shall then take <br />immediate measures to remedy the stated deficiencies and send an additional written notice <br />to the Designer certifying that the work is complete. The Designer shall re- inspect the work <br />within ten days after receipt of certification. <br />3.03 Reinspection Costs <br />Should the Designer incur additional charges as a result of additional inspections for non- <br />compliance, the Contractor shall compensate the Owner for such additional charges. Such costs shall <br />be deducted from final payment to the Contractor. <br />3.04 Close -out Submittals <br />A. Project record documents: As required by Section 017839. <br />B. Warranties: As required by Section 017850. <br />C. Evidence of payment and release of liens. <br />17 -198 Project Closeout Procedures <br />017700.2 <br />