Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />3. The time to be allowed for Contractor to complete or correct listed items. <br />4. Time and date Owner will assume possession of the work or designated portion <br />thereof. <br />Signature of Designer and Contractor. <br />E. Contractor shall then complete or correct those items so listed within the designated time and <br />inform the Owner and Designer upon completion. <br />F. Should the Owner and Designer determine that the work is not substantially complete the <br />Designer shall immediately notify the Contractor in writing stating the reasons. Contractor <br />shall then complete the work and send a second written notice to the Designer certifying that <br />the project or designated portion thereof, is substantially complete. The Designer shall re- <br />inspect the work within seven days after receipt of certification. <br />3.02 Final Inspection <br />A. Contractor shall: Submit written certification to the Designer that: <br />1. The contract documents have been reviewed. <br />2. Work has been completed in accordance with the contract documents. <br />3. The project has been inspected for compliance with the contract documents. <br />4. The project is ready for final inspection. <br />B. Provide safe access to all areas of the facility to accommodate personnel for the final <br />inspection. <br />C. The Designer shall make a final inspection within ten days after receipt of certification. <br />D. Should the Designer determine that the work is finally complete in accordance with the <br />requirements of the contract documents, the Designer shall request that the Contractor <br />submit the appropriate project close -out documentation. <br />E. Should the Designer determine that the work is not finally complete, the Designer shall <br />immediately notify the Contractor in writing stating reasons. The Contractor shall then take <br />immediate measures to remedy the stated deficiencies and send an additional written notice <br />to the Designer certifying that the work is complete. The Designer shall re- inspect the work <br />within ten days after receipt of certification. <br />3.03 Reinspection Costs <br />Should the Designer incur additional charges as a result of additional inspections for non- <br />compliance, the Contractor shall compensate the Owner for such additional charges. Such costs shall <br />be deducted from final payment to the Contractor. <br />3.04 Close -out Submittals <br />A. Project record documents: As required by Section 017839. <br />B. Warranties: As required by Section 017850. <br />C. Evidence of payment and release of liens. <br />17 -198 Project Closeout Procedures <br />017700.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.