Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 017700 <br />PROJECT CLOSEOUT PROCEDURES <br />PART1 GENERAL <br />1.01 Related Documents <br />Drawings and general provisions of the contract including General and Supplementary Conditions <br />and other Division 1 specification sections apply to work of this section. <br />1.02 Description <br />To provide a specific format for substantial completion and final inspection. <br />1.03 Related requirements specified elsewhere. <br />A. Cleaning: Section 017710 <br />B. Project Record Documents: Section 017839 <br />C. Warranties: Section 017850 <br />D. Close -out submittals required for trades: Respective section of specification <br />1.04 Quality Assurance <br />A. All documents submitted to the Designer shall be signed by a person authorized to endorse <br />contracts on behalf of the Contractor. <br />B. All formats for documents shall be approved by the Designer. <br />PART2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />3.01 Substantial Completion <br />A. Substantial completion — The Work has progressed to the point where, in the opinion of the <br />Designer, it is sufficiently complete, in accordance with the Contract Documents, so that the <br />Work can be utilized for the purposes for which it is intended. <br />B. Submit written certification to the Designer when the project or designated portion of the <br />project is substantially complete. A list of major items to be completed or corrected shall be <br />stated. <br />C. Owner and Designer shall make an inspection within ten days after receipt of certification. <br />D. Should the Owner and Designer determine that the work is substantially complete, the <br />Designer shall prepare and issue a certificate of substantial completion containing: <br />1. Date of Substantial Completion <br />2. Listing of items to be completed or corrected and any amendments by Owner. <br />17 -198 Project Closeout Procedures <br />017700.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.