Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 016000 <br />PRODUCT REQUIREMENTS <br />PART1 GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General and Supplementary General <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Products <br />A. Products include materials, equipment and systems. <br />B. Furnish products of qualified manufacturers suitable for intended use. Furnish products <br />of each type by single manufacturer unless specified otherwise. <br />C. All materials shall comply with specifications and referenced standards as minimum <br />requirements. The latest edition of referenced standards apply unless specifically stated <br />otherwise. <br />D. Do not use materials and equipment removed from the existing structure, except as <br />specifically required or allowed by contract documents. <br />1.03 Product Delivery <br />A. All aspects of material and equipment transportation, delivery, unloading, handling, storage, <br />etc. shall be the responsibility of the Contractor. <br />B. Products shall be transported by methods to avoid product damage; deliver all materials with <br />manufacturer's labels intact and legible. <br />C. Promptly inspect shipments to ensure products comply with requirements, quantities are <br />correct, and products are undamaged. <br />D. Provide equipment and personnel to handle products by methods to prevent damage, soiling, <br />or disfigurement. Damaged material shall be subject to rejection by the Owner or Designer. <br />E. Arrange deliveries of materials in accordance with construction schedules and in ample time <br />to facilitate inspection prior to installation. <br />1.04 Product Storage and Handling <br />A. Store and protect products in accordance with manufacturers' instructions. <br />17 -198 Product Requirements <br />16000.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.