Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 014000 <br />QUALITY CONTROL <br />PART1 GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General, Supplemental, Special <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Quality Control - Contractor <br />A. Maintain quality control over products, services, site conditions, and workmanship, to <br />produce work of specified quality. <br />B. Provide safe access to the site for inspection by the Owner or its authorized representative. <br />C. Comply with industry standards except when more restrictive tolerances or specified <br />requirements indicate more rigid standards or more precise workmanship. <br />D. Perform work by persons qualified to produce workmanship of specified quality. <br />E. Secure products in place with positive anchorage devices designed and sized to withstand <br />stresses, vibration, and racking. <br />1.03 Quality Control - Owner <br />A. The Owner reserves the right, at its discretion, to retain the services of an independent <br />construction quality assurance representative to provide quality assurance of the work. <br />Testing may be performed to determine any deficiencies in the roofing assembly. <br />B. The cost of such services shall be borne by the Owner during the contract time. Any <br />monitoring and testing required due to the installation being incomplete as a result of <br />Contractor - controlled nonperformance shall be borne by the Contractor. <br />C. The Contractor shall be required to notify the Owner or its designated representative prior <br />to cancellation of any operations and subsequent restart of the project. Any cost resulting <br />from the failure to notify shall be borne by the Contractor. <br />D. Work found to be in violation of the specifications, or not in conformance with acceptable <br />roofing standards, shall be subject to rejection including complete removal and replacement <br />with new material at the Contractor's expense. <br />E. The Designer shall document quantities of those materials bid on a unit price basis listed in <br />the Form of Proposal as well as other materials. <br />17 -198 Quality Control <br />014000.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.