Orange County NC Website
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />3.02 Review <br />A. Review by the Designer shall be directed to the general method of construction only and <br />shall not be construed as a complete check, nor shall this review relieve the Contractor from <br />responsibility for errors and/or omissions which may exist. <br />B. The notations "Reviewed" or "Reviewed as noted" signed off by the Designer shall authorize <br />the Contractor to proceed with fabrication, purchase, or both subject to the revisions, if any <br />required by the Owner's review comments. The notations "Revise and Resubmit" or <br />"Disapproved and Resubmit" shall require appropriate action and shall not authorize the <br />Contractor to proceed until the item(s) in question have/has been corrected. <br />C. The Contractor shall make all revisions as required. If the Contractor considers any required <br />revisions to constitute a change notification shall be given to the Designer under the <br />provisions as specified in the general conditions. Only those revisions directed or approved <br />by the Designer shall be shown on the resubmittal. <br />D. After a submittal has been approved by the Designer, substitution of materials or equipment <br />shall not be considered unless approved by the Designer and accompanied by an acceptable <br />explanation as to the necessity of the substitution. <br />3.03 Claims for Extra Cost <br />No claim for extra cost shall be based on Work shown on shop drawings unless such claim is made <br />on the Contractor's letter of transmittal accompanying the shop drawings and is approved by the <br />Owner in writing. <br />3.04 Payment for Review <br />A. Initial Services: The Designer shall provide an initial review and one subsequent review of <br />submittals as required. <br />B. Subsequent Reviews: The Designer's costs associated with additional reviews required <br />beyond the initial review and one subsequent review shall be paid directly by Contractor. <br />END OF SECTION <br />17 -198 Submittals <br />013300.4 <br />