Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />B. Whenever a choice of color is available for a specified product, accurate color charts shall be <br />submitted to the Designer for review and selection. <br />1.08 Personnel <br />A. Within seven days of the award of contract, submit the names of superintendent and <br />foreman, or foremen, proposed for this project. <br />B. Superintendent named shall remain on the project for its entire duration. Written request <br />to the Owner shall be required prior to replacement of superintendent. <br />C. If non - English speaking workmen are employed, the foreman and superintendent shall <br />be fluent in their language and in English. <br />D. Superintendent shall be present during any progression of work. <br />1.09 Manufacturer Training <br />Within seven days of the date of Notice to Proceed, submit a letter from the membrane manufacturer <br />listing the names of those Contractor personnel who will be working on this project and are trained <br />and qualified to install the system. <br />1.10 Insurance Certificates <br />Submit insurance certificate issued to Owner by Contractor's insurance carrier listing all coverage's <br />as specified in the Owner's General and Supplementary Conditions. <br />1.11 Permits <br />Provide building permits required by federal, state, or local entity for the construction or demolition <br />work required during the progress of the Work. If no permits are required, so state. <br />1.12 Safety <br />Provide a copy of company's safety and fall protection plan for the project. <br />PART2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />3.01 Timing <br />A. Make all submittals in accordance with schedules specified herein unless otherwise <br />required. <br />B. A minimum of seven working days shall be allowed for review by the Designer <br />following its receipt of the submittal. <br />C. Delays caused by tardiness in receipt of submittals shall not be an acceptable basis <br />for extension of the contract completion date. <br />17 -198 Submittals <br />01 3300.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.