Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 013300 <br />SUBMITTALS <br />PART1 GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General, Supplemental, and Special <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Procedures <br />A. Within seven calendar days after receipt of Notice to Proceed, the successful Contractor(s) <br />shall submit the required information to the Designer via electronic transmission. <br />Acknowledgement of acceptance, approval or rejection will be transmitted via electronic <br />transmission to the Contractor. <br />B. Each transmitted item shall identify the project ID #, name and Contractor. Material <br />submittals shall also identify the type and trade name of material, material manufacturer, <br />intended use, and specification number. Deviations from contract documents shall be <br />identified. <br />C. Shop drawings shall be made accurately to a scale sufficiently large to show all pertinent <br />aspects of the item. <br />D. All submittals shall bear the contractor's stamp, date and signature acknowledging review for <br />compliance with specifications. <br />E. After Designer's review of material, revise and resubmit, as required, identifying changes <br />made since previous submittal. <br />F. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly <br />report inability to comply with requirements. <br />G. Submittals not requested shall not be recognized or processed. <br />1.03 Pre -Job Damage Survey <br />A. Perform and submit a pre job damage survey of rooftop equipment /features, building <br />exterior, site, pavements, and applicable building interior to document existing conditions <br />prior to beginning work in accordance with Section 010100, Summary of Work. <br />B. Submit one copy of the required documentation, in CD or DVD format, to include <br />photographs of the survey and additional sketches or documentation as necessary to <br />adequately describe the location of existing conditions and defects and to verify the date <br />of the survey. <br />17 -198 Submittals <br />013300.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.