DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />1.04 Schedule <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />A. Within seven days after receipt of Notice to Proceed the Contractor shall submit one copy of <br />the construction schedule to the Designer. The schedule shall be forwarded to the Designer <br />via electronic means. <br />B. On the first working day of each month the schedule shall be updated and submitted to the <br />Owner. <br />PART2 PRODUCTS <br />2.01 Diagram <br />A. Graphically show the sequence and interdependence of all activities necessary to complete <br />the Work and the order in which such activities are to be accomplished as planned by the <br />Contractor and its project field supervisor in coordination with all subcontractors whose <br />work is shown on the diagram. Activities shown on the diagram shall include, but are not <br />necessarily limited to: <br />1. Submittals and approvals of shop drawings and samples <br />2. Procurement of equipment and materials <br />3. Project mobilization <br />4. Demolition/Preparation <br />5. Construction <br />6. Miscellaneous Work <br />7. Final clean up <br />8. Final inspection <br />9. All activities by the Owner which affect progress, required completion dates, or <br />both, for all and each part of the work. <br />B. The detail of information shall be such that duration times of activities shall normally range <br />from one to thirty days. The selection and number of activities shall be subject to approval <br />by the Owner. <br />C. Mathematical Analysis: Tabulate each activity of detailed network diagrams, using <br />calendar dates, and identify for each activity: <br />1. Preceding and following event numbers <br />2. Activity description <br />3. Estimated duration of activity, in maximum 30 day intervals <br />4. Earliest start date <br />5. Earliest finish date <br />6. Actual start date <br />7. Actual finish date <br />8. Latest start date <br />9. Latest finish date <br />10. Total and free float; accrue float time to Owner and to Owner's benefit <br />11. Monetary value of activity, keyed to Schedule of Values <br />12. Percentage of activity completed <br />13. Responsibility <br />17 -198 Construction Progress Schedule <br />013216.2 <br />