Orange County NC Website
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 013216 <br />CONSTRUCTION PROGRESS SCHEDULE <br />PART1 GENERAL <br />1.01 Related Documents <br />Drawings and general provisions of the contract including General and Supplementary Conditions <br />and other Division 1 specification sections apply to work of this section. <br />1.02 Description <br />A. To assure adequate planning and execution of the work so as to complete the project within <br />the time period allowed in the contract and to assist the Designer in evaluating progress of <br />the work. <br />B. "Day" used throughout the contract shall mean "Consecutive Calendar Days" unless <br />otherwise stated. <br />C. "Work day" shall be any weekday, exclusive of Saturdays, Sundays, or a recognized legal <br />holiday on which weather or other conditions (not under control of the contractor) will <br />permit construction operations to proceed for not less than 3/4 of a normal work day in the <br />performance of a controlling item of work. The contractor shall denote such controlling <br />work items on the critical path schedule to be submitted as a part of this project. Should <br />such conditions permit operations to proceed for at least 1/2 but less than 3/4 of normal <br />working hours, 1/2 of a work day shall be counted. Days counted shall exclude Saturdays, <br />Sundays, and recognized legal holidays the Contractor does not work but will include <br />Saturdays, Sundays, and recognized legal holidays the Contractor does work. Work days <br />shall be counted during periods of suspension of work ordered by the Designer except when <br />the suspension is a result of a violation of terms of the contract. <br />1.03 Adherence to Approved Schedule <br />A. Should any activity not be completed within ten days after the scheduled completion date, <br />the Owner shall have the right to order the Contractor to expedite completion of the activity <br />by whatever means the Owner deems appropriate and necessary without additional expense. <br />B. Should any activity be 30 or more days behind schedule the Owner shall have the right to <br />complete the activity or to have the activity completed by whatever means the Owner deems <br />appropriate and necessary. <br />C. The Owner shall assess a dollar value for the work not completed after the scheduled <br />completion date and will include this information in the activity report. <br />D. Failure by the Owner to exercise the option to either order the Contractor to expedite an <br />activity or to expedite an activity by other means shall not be considered precedent setting <br />for any other activity(ies). <br />17 -198 Construction Progress Schedule <br />013216.1 <br />