Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />DIVISION 1 <br />GENERAL REQUIREMENTS <br />SECTION 012200 <br />PROJECT MEETINGS <br />PART1 GENERAL <br />1.01 Related Documents <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />Drawings and general provisions of the contract including General, Supplemental, and Special <br />Conditions and other Division 1 specification sections apply to work of this section. <br />1.02 Description <br />To provide for an orderly review during progress of the work and to provide for the systematic <br />discussion of problems that may arise throughout the construction period. <br />1.03 Representation <br />Each Contractor and major Subcontractor shall be represented at every meeting by a responsible <br />representative member of its organization. The Owner, Designer, and/or its authorized representative <br />shall also attend. <br />1.04 Submittals <br />A. The proceedings of these meetings shall be recorded by the Contractor. One copy of the <br />proceedings shall be furnished to the Owner and each required representative. <br />B. Occasionally the Designer shall conduct a meeting. By conducting and recording the <br />meeting, it shall not be construed that the Designer is scheduling or coordinating <br />Contractor's work. <br />1.05 Decisions /Interpretations <br />All decisions and interpretations given by the Designer at project meetings shall be made on behalf <br />of the Owner and shall be conclusive on each contractor affected. <br />PART2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />3.01 Periodic Project Meetings <br />A. Project meetings shall be scheduled as agreed to by the Owner's representative, Designer and <br />Contractor(s) at a Pre - Construction meeting. <br />B. If a change in schedule is required due to causes beyond the control of the Owner or <br />Designer, the Designer shall advise each concerned party in advance of such a change. <br />3.02 Location - Meetings shall be held at the job site to the maximum extent possible. <br />17 -198 Project Meetings <br />012200.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.