Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />DIVISION 1 <br />GENERAL REQUIRMENTS <br />SECTION 012000 <br />PRICE AND PAYMENT PROCEDURES <br />PART GENERAL <br />1.01 Related Documents: <br />Drawings and general provisions of the contract including General, Supplemental, and Special Conditions <br />and other Division 1- specification sections apply to work of this section <br />1.02 Section Includes <br />A. <br />Cash allowances <br />B. <br />Contingency allowances <br />C. <br />Schedule of values <br />D. <br />Applications for payment <br />E. <br />Change procedures <br />F. <br />Defect assessment <br />G. <br />Unit prices <br />H. <br />Alternates <br />1.03 Cash Allowances <br />A. Costs Included in Cash Allowances: Cost of product to Contractor or Subcontractor, less <br />applicable trade discounts. <br />B. Costs Not Included in Cash Allowances But Included in Contract Sum: Product delivery <br />to site and handling at site, including unloading, uncrating, and storage; protection of <br />products from elements and from damage; and labor for installation and finishing. <br />C. Designer Responsibilities: <br />1. Consult with Contractor for consideration and selection of products, suppliers, <br />and installers. <br />2. Select products in consultation with Owner and transmit decision to Contractor. <br />3. Prepare Change Order. <br />D. Contractor Responsibilities: <br />1. Assist Designer in selection of products, suppliers and installers. <br />2. Obtain proposals from suppliers and installers and offer recommendations. <br />3. On notification of selection by Designer execute purchase agreement with <br />designated supplier and installer. <br />4. Arrange for and process shop drawings, product data, and samples. Arrange for <br />delivery. <br />5. Promptly inspect products upon delivery for completeness, damage, and defects. <br />Submit claims for transportation damage. <br />E. Differences in costs will be adjusted by Change Order. <br />17 -198 Price and Payment Procedures <br />012000.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.