Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants <br />E. No tobacco product usage is permitted. <br />Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />F. There shall be no contact between workers and occupants or users of the building. <br />G. Only the superintendent and foreman will be allowed in the building, unless during an <br />emergency. <br />1.08 Owner Occupancy: <br />Owner will occupy premises during entire period of construction to conduct normal operations. <br />The Contractor shall cooperate with Owner to minimize conflict, and to facilitate Owner's <br />operations. <br />1.09 Coordination: <br />A. Coordinate work of the various sections of specifications to assure efficient and orderly <br />sequence of installation of materials. <br />B. Coordinate work under this contract with other contract work relating to the same <br />building /roof areas to assure efficient and orderly sequence of installation of materials. <br />1.10 Reference Standards: <br />A. Products specified by association or trade standards must comply with those standards, <br />except when more rigid requirements are specified herein or are required by applicable <br />codes. <br />B. The date of the standard is that which is in effect as of the bid date unless otherwise <br />stated. <br />C. Should there be a discrepancy between the referenced standards and these contract <br />documents, the latter shall govern unless written interpretation is obtained from the <br />Designer. <br />D. Should there be discrepancies among the referenced standards; the more stringent <br />requirements shall govern. <br />1.11 Safety <br />The Contractor shall follow all safety requirements as obligated by local, state and federal <br />regulations, and the Owner. <br />PART2 PRODUCTS <br />Not Used <br />PART 3 EXECUTION <br />Not Used <br />END OF SECTION <br />17 -198 Summary of Work <br />01 0100.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.