Browse
Search
2018-093-E AMS - Century Slate Company Replace roof at SDC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-093-E AMS - Century Slate Company Replace roof at SDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:25:01 PM
Creation date
3/19/2018 5:26:12 PM
Metadata
Fields
Template:
Contract
Date
3/14/2018
Contract Starting Date
3/14/2018
Contract Ending Date
5/30/2018
Contract Document Type
Agreement - Construction
Amount
$43,255.00
Document Relationships
R 2018-093 AMS - Century Slate Company Replace roof at SDC
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B49FB256 -4ADF- 4759- AF63- 134AD44FC239 <br />5thWall Building Diagnostics Consultants Slate Roof Replacement <br />Orange County Skills Development Center <br />Chapel Hill, NC <br />August 2017 <br />B. Obtain necessary permits and inspections for any mechanical, electrical, and/or plumbing <br />work associated with raising/extending of existing ductwork, conduit, piping, and pipe vents <br />to provide specified flashing clearances above new roof membrane. Provide evidence of <br />acceptance of work by submitting inspection forms from appropriate agencies that indicate <br />acceptance of the Work. <br />1.06 Existing Conditions <br />A. Existing conditions are reflected to the best of the Designer's knowledge based on randomly <br />and arbitrarily selected sample areas. It is the responsibility of the Contractor to visit the site <br />as required to verify existing conditions, dimensions, and quantities, etc. prior to preparation <br />and submission of bids. <br />B. The Owner and Designer make no representation, warranty or guarantee that conditions <br />indicated by the drawings and specifications are representative of those conditions found <br />throughout the entire work areas, or that materials other than, or in proportions different <br />from those indicated, may not exist. <br />C. Building and site shall be accepted "as -is." Exercise care to protect existing conditions. <br />D. Notify Owner and Designer should the conditions vary significantly from those described in <br />the Contract Documents. <br />E. Pre -Job Damage Survey of Facility and Site: A thorough survey of property, interior and <br />exterior, shall be performed prior to starting the Work in order to document existing <br />conditions. A photographic record of all conditions shall be provided to the Owner and <br />Designer prior to beginning work. Damaged items identified on the photographic record <br />shall not be the responsibility of Contractor unless further damaged by Contractor during <br />execution of Project. Any equipment identified to be damaged or abandoned shall be <br />reported to the Owner as a part of the survey for determination of item removal or repair. <br />F. Correction of Damage to Property: The Contractor shall be responsible for repair or <br />replacement of materials that are damaged during construction activities and are not <br />documented to have been existing prior to beginning the work. Items /materials that are <br />damaged shall be returned to original condition prior to conclusion of construction <br />activities. If return to original condition is not possible or practical, Contractor shall <br />replace items /materials with new as approved by the Designer and the Owner. The <br />Owner reserves the right to perform prompt repairs /replacement to such damages with its <br />own forces and to reduce the Contract Sum by such an amount to reimburse for repairs <br />required. <br />1.07 Contractor Use of Premises: <br />A. Limit use of premises for construction operations to allow for Owner occupancy. <br />B. Coordinate use of premises under direction of the Owner. <br />C. Contractor shall be held liable for any damages to the building, building contents, or its <br />occupancy resulting from work under this contract. <br />D. Keep driveways and entrances serving the premises clear and available at all times. Do <br />not use areas for vehicle parking or storage of materials or equipment. <br />17 -198 Summary of Work <br />010100.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.