Orange County NC Website
Dr. Shirley Carraway <br />RE: Middle School #3 Bid Tabulation <br />C Electrical Contractor: <br />Starr Electric Co., Inc. <br />6 Battleground Court <br />Greensboro, NC 27408 <br />December 15, 2004 <br />page 2 <br />Base Bid: $ 1,649,000 <br />Alt. #3: Front Entrance Canopy: $ (8,600) <br />Alt. #4: Photovoltaic system/power <br />storage/distribution System $ 14,000 <br />Alt. #13: Security System by Ademco: $ No chance <br />Total Base Bid + accepted Alternates: $ 1,654,400 <br />D. Plumbing Contractor: ABL & Associates Plumbing, LL.C <br />300 Hoke Street <br />Raleigh, NC 27601 <br />Base Bid: $ 1,050,899 <br />Alt. #5: Solar Water Heating System: $ 51,728 <br />Alt. #3: Canopy Roof Leader: $ 3,819 <br />Total Base Bid + accepted Alternates: $ 1,106,446 <br />TOTAL MULTI-PRIME BASE BIDS AND RECOMMENDED ALTERNATES: $18,273,846 <br />Summary: General Construction: $13,568,000 <br />HVAC: 1,945,000 <br />Electrical: 1,654,400 <br />Plumbing: 1,106,446 <br />$18,273,846 <br />The above construction bids, added to the early sitework package contract (presently under <br />construction) and the playing field and irrigation work (contract pending), equals $18,983,091. On <br />September 9, 2004, we presented to the School Board an estimate of $18,826,700 for the same scope <br />of work. The difference between the estimate and the actual bid is less than 1%, which confirms the <br />timeliness and accuracy of the estimate. <br />Based on this information, we recommend moving forward with preparation of contracts for the <br />new middle school for the Orange County Board of Education. <br />Please contact me if you have any questions or comments. <br />Sincerel , <br />i vl'? <br />e th edoot, <br />ice President <br />KER:esw/0310-bid. rec <br />cc: George McFarley, lr. <br />\111 <br />CORLEY REDFOOT ZAIX,?