Browse
Search
Agenda - 01-24-2005-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 01-24-2005
>
Agenda - 01-24-2005-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:04:45 AM
Creation date
8/29/2008 10:00:34 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2005
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20050124
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
ORD-2005-006 - Middle School #3 Orange County Schools Capital Project Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2005
RES-2005-004 Intent to appropriate additional funds for construction of OCS Middle School #3
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORLEY REDFOOT ZACK INC ) D <br />A R CHITE.C TS • ENGINEERS - PLA N N ERS <br />December 15, 2004 <br /> Dr. Shirley Carraway, Superintendent <br /> Orange County Schools <br /> 200 East King Street <br />GLENN D. CORLEY,AIA Hillsborough, NC 27278 <br />President, CEO <br />KENNETH E. REDFOOT,AIA RE: Middle School #3 <br />Vice President West Ten Road, Orange Co.., NC <br />MARK ZACK, AIA Project #0310 <br />Vice President BID TABULATION <br />MICHAELL, HAMMERSLEY,PE <br />Principal Dear Dr. Carraway: <br />LAURENCEW. RUNCH,AIA <br />Associate In accordance with your request, I am sending you the certifi ed bid tabulation <br />ANDREW R. CRUICKSHANK, AIA for the above-referenced project. Bids for a single prime and for multi-prime <br />Associate contracts were opened at 4:00 PM, on December 7, 2004, at the School Board <br />DAVID M. TAYLOR, AIA building in Hillsborough, NC. <br />lssociate <br />HARRY M. JENSEN Listed below are the apparent low multi-prime bidders, based on their Base <br />Associate Bids and the Alternates which were reviewed and approved i n our discussions <br />KENNETH E. SMITH with you and George McFarley, Jr., on December 14, 2004: <br />Associate <br /> A. General Construction: J. H. Allen , Inc. <br /> 409 W. Central Avenue (27203) <br /> PO Drawer 2809 <br /> Asheboro, NC 27204 <br /> Base Bid: $13,445,000 <br /> Alt. #3: Front entrance canopy 108,000 <br /> Alt, #4: Photovoltaic system/power storage/- <br />PO Box 2368 distribution system 5,300 <br />Chapel Hill, NC 27515-2368 Alt. #5: Solar water heating system 9,700 <br /> Alt. #15: Use specific brands for kitchen equipment no change) <br />222 Cloister Court Total Base Bid + accepted <br />alternates: <br />$13 <br />568 <br />000 <br />Chapel Hill, INC 27514-2212 , <br />, <br /> B. HVAC Contractor: Indicor <br /> 1217 Rail Street (27407) <br /> PO Box 8794 <br /> Greensboro, NC 27419 <br /> Base Bid: $ 1,849,000 <br /> Alt. #9: HVAC Equipment by Trane: $ No change <br /> Alt. 410: Boilers by Weil McClaim with <br /> Webster Burners: $ No change <br /> Alt. #11: HVAC Pumps by B&G: $ 8,000 <br />(919) 942-8586 Telephone Alt. #12: HVAC Control by Invensys <br />(919) 929-4802 Fax supplied by Yamas: $ 88,000 <br /> Total Base Bid + accepted Alternates: $ 1,945,000
The URL can be used to link to this page
Your browser does not support the video tag.