Orange County NC Website
‐ Major Transportation Corridor (MTC) buffer consistent with the applicant’s requested <br />modifications as detailed herein. <br />‐ Signage - No ground lighting, architectural monument. <br />‐ Public School Land Use, not permitted in District 1 or 2. <br />‐ Utilities - Utility design to serve project and EDD area within industrial and retail design <br />parameters. <br />‐ Transportation - Various improvements as detailed in Attachments 1 and 2, summarized <br />herein, for two build phases (2020 and 2022) which includes approximately 14 specific <br />road development criteria (both roadway and signalization). <br />‐ Master Concept Plan - More detailed concept plan within the districts. <br />‐ Environmental - Preservation of floodplains and buffers consistent with FEMA and the <br />UDO, as well as preservation of specimen trees. <br />‐ Lighting Inventory - Adherence to County’s existing lighting ordinance as well as Crime <br />Prevention Through Environmental Design (CPTED) techniques. <br />‐ Land Use Non-Residential - Land uses are consistent with the Orange County and Town <br />of Hillsborough joint land use plan which identifies the interstate interchange area as an <br />employment center with supporting retail uses for daytime employees (to create internal <br />pedestrian and traffic capture) and other interstate retail users to promote day and night <br />business sustainability. Retail is suggested to be limited to 30% of total allowable square <br />footage in District 2 or approximately 78,540 square feet. Note: this is relatively minor <br />percentage of total proposed square footage (~5% of Industrial floor area) of the entire <br />project (District 1 and 2). <br />FINANCIAL IMPACT: This request has been reviewed by various County departments who <br />have determined that the approval or denial of the request would not create the need for <br />additional funding for the provision of County services. Costs associated with advertising, <br />including the public hearing notice and mailings, were paid by the applicant in accordance with <br />the adopted Orange County Fee Schedule. <br /> <br />RECOMMENDATION: The Planning Director recommends the Board: <br />1. Receive the revised information, <br />2. Deliberate on the proposal as desired, <br />3. Consider the Planning Director’s recommendation, and <br />4. Make a recommendation to the BOCC on the revised Statement of Consistency <br />(Attachment 5) and the proposed ordinance (Attachment 6). <br /> 232