Orange County NC Website
2 <br />Michael D. Harvey AICP, CFM, CZO  <br />Current Planning Supervisor – Planner III  <br />Orange County Planning Department  <br />131 West Margaret Lane  <br />PO Box 8181  <br />(919) 245‐2597 (phone)  <br />(919) 644‐3002 (fax)  <br />  <br />Pursuant to North Carolina General Statute 132, correspondence sent and received from this account is a public record  <br />and may be disclosed to third parties.    <br />  <br />From: Ed Sirgany [mailto:ed.sirgany@summitde.net] <br />Sent: Friday, November 17, 2017 10:15 AM <br />To: Michael Harvey <br />Cc: 'Ariel Gamboa'; 'Jim Parker'; Chuck Edwards Contact <br />Subject: RE: Proposed Settlers Pointe- Revised Access Configuration and Revised Traffic Analysis, <br />  <br />Michael,  <br />  <br />The drawing seems to have introduced some confusion in comparison to the original sketches in the TIA, and I think I  <br />can clear things up for you fairly easily.  I am available today and Monday to meet with you, I can come to you, or you  <br />can come over to our office if you would like.  <br />  <br />Edward W. Sirgany, PE <br />Traffic & Technology Engineer <br />Phone: (919) 732-3883 x3139 <br />Fax: (919) 732-6676 <br />ed.sirgany@summitde.net <br />  <br />   <br />Creatively Inspired – Technically Executed <br />  <br />www.summitde.net <br />   <br />  <br />From: Michael Harvey [mailto:mharvey@orangecountync.gov]   <br />Sent: Thursday, November 16, 2017 3:13 PM  <br />To: Chuck Edwards Contact <cnedwards@ncdot.gov>; Ed Sirgany <ed.sirgany@summitde.net>; Jim Parker  <br />(jimparker16@gmail.com) <jimparker16@gmail.com>; Ariel Gamboa (ariel.gamboa@summitde.net)  <br /><ariel.gamboa@summitde.net>; Craig Benedict <cbenedict@orangecountync.gov>; Tom Altieri  <br /><taltieri@orangecountync.gov>; Nishith Trivedi <ntrivedi@orangecountync.gov>  <br />Cc: Bunting, Clarence B <cbunting@ncdot.gov>; Sorrell, Charles V <csorrell@ncdot.gov>; Ishak, Doumit Y  <br /><dishak@ncdot.gov>; Jones, DeAngelo J <djjones1@ncdot.gov>  <br />Subject: RE: Proposed Settlers Pointe‐ Revised Access Configuration and Revised Traffic Analysis,  <br />  <br />On another general note the scale of the Summit revised plan, as provided to us by NC DOT AND not the applicant, are  <br />missing.  There is no notation whatsoever that I have been able to find denoting what the scale of the drawing  <br /> 45