Orange County NC Website
Graphics <br />The bar chart below shows the percent of the total investment by mode for each of the three <br />decades. Transit investments are relatively larger in the first two decades because of the large <br />capital investments in light rail and commuter rail. <br />The pie graph below shows the percent of total investment, i.e., 2025, 2035 and 2045, by <br />mode. Roadway improvements and roadway maintenance are the same. The transit, bicycle, <br />pedestrian and TDM investment is less than one-half of the total, 42%. It is difficult to get these <br />investments higher and continue to mostly abide to the STI funding restrictions. <br />0% <br />10% <br />20% <br />30% <br />40% <br />50% <br />60% <br />70% <br />80% <br />90% <br />100% <br />2025 2035 2045 <br />Bike/Ped/TDM <br />Transit <br />Roadway <br />Maintenance <br />Roadway <br />Improvements <br />Roadway <br />Improvements <br />29% <br />Roadway <br />Maintenance <br />29% <br />Transit <br />39% <br />Bike/Ped/TDM <br />3% <br />Total MTP Costs by Mode <br />Page 35 <br />Technical Committee 10/25/2017 Item 5 210