Browse
Search
OCPB agenda 121817
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2017
>
OCPB agenda 121817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 4:06:41 PM
Creation date
3/14/2018 3:58:17 PM
Metadata
Fields
Template:
BOCC
Date
12/18/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 121817
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. Construction of a super-street type U-Turn bulb intersection to be located <br />approximately 1,000 feet south of the Service Road on Old NC 86, with 200 <br />feet of storage and taper, upon construction of greater than 900,000 square <br />feet of warehouse facility. <br />STAFF COMMENT: Please refer to the previous comment for an <br />assessment of this recommended improvement. <br />i. Construction of a right turn lane on Old NC 86 southbound at Davis Road <br />with 150 feet of storage and taper, upon construction of 900,000 square feet <br />of warehouse facility. <br />STAFF COMMENT: Please refer to the previous comment for an <br />assessment of this recommended improvement. <br />Recommended improvements for the 2022 Buildout Phase are: <br />i. Construct a full access on Old NC 86 at the location of the U-Turn <br />intersection installed under the 2020 Phase I Build, with two exiting lanes <br />and one entering lane. Construct a right turn lane with 125 feet of storage <br />and taper on the westbound approach, a thru-right turn lane on the <br />northbound approach with 200 feet of storage and taper, and a second <br />southbound left turn lane with 300 feet of storage and taper. <br />ii. Install a traffic signal at the intersection of Old NC 86 new retail access/U- <br />Turn intersection. <br />iii. Construct an additional lane on Old NC 86 southbound, continuous <br />between the Service Road and the new Retail Dr. intersection. Re-stripe the <br />inside lane for left turns at the signalized intersection. <br />iv. Construct an additional lane on the Old NC 86 northbound, continuous <br />between the new signalized Retail Dr. and the Service Road. <br />v. Construct a right-in/right out access for the retail/office/hotel parcels on Old <br />NC 86 approximately 500 feet south of the Service Road. <br />Maps(s) denoting the identified improvement(s) are contained in Attachment 1. Staff <br />comment(s) on the review of the TIA are contained within Attachment 2. <br />STAFF COMMENT: As previously indicated staff is concerned the <br />anticipated U-turn configuration is not viable along this stretch of Old NC <br />Highway 86 as envisioned due to the following: <br />i. The TIA indicates the U-turn will be approximately 1,000 ft. south <br />of the intersection of Service Road and Old NC Highway 86, <br />beginning at an existing curve within the roadway. <br />ii. Current posted speed limits allow for vehicles to travel 45 miles per <br />hour along Old NC Highway 86. All of this going uphill for those <br />going south and downhill for those going north. Staff is concerned <br />over the site distance of the proposed U-turn intersection for both <br />south and north bound traffic. <br />Further, staff believes existing speed limit(s) are not conducive to <br />safe travel along the roadway with the introduction of a U-turn <br />intersection. <br /> 15
The URL can be used to link to this page
Your browser does not support the video tag.