Browse
Search
OCPB agenda 121817
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2017
>
OCPB agenda 121817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2018 4:06:41 PM
Creation date
3/14/2018 3:58:17 PM
Metadata
Fields
Template:
BOCC
Date
12/18/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 121817
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ORANGE COUNTY <br />PLANNING BOARD <br />ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: December 18, 2017 <br /> Action Agenda <br /> Item No. 8 <br /> <br />SUBJECT: Population and Employment Projections (Durham-Chapel Hill-Carrboro <br />Metropolitan Planning Organization 2045 Metropolitan Transportation Plan) <br /> <br />DEPARTMENT: Planning and Inspections <br /> <br />ATTACHMENT(S): <br />1. PowerPoint Presentation <br />2. Items of Interest in 2045 MTP <br /> Preferred Option <br />3. Draft 2045 MTP Preferred Option <br /> <br />INFORMATION CONTACT: <br />Craig Benedict, Planning & Inspections <br />Director, 919-245-2592 <br /> <br /> <br />PURPOSE: To receive a presentation primarily on the population and employment projections <br />used in the 2045 Metropolitan Transportation Plan (MTP) Preferred Option. <br /> <br />BACKGROUND: The Durham-Chapel Hill-Carrboro Metropolitan Planning Organization, <br />(DCHC MPO) which is responsible for long range transportation planning for Durham County <br />and parts of Orange and Chatham Counties, is updating its MTP. The 2045 MTP is a federally <br />required, financially constrained, plan that recommends major transportation projects, policies <br />and strategies designed to maintain existing transportation systems and address the region’s <br />future travel needs. Projects must be in the 2045 MTP to receive any state and federal <br />transportation funding through the State Transportation Improvement Program (STIP). <br /> <br />The Board of County Commissioners received this presentation on November 20th. Staff is <br />providing this presentation to the Planning Board primarily as information but also to find <br />opportunity for Planning Board comments. Any comments received will be communicated to the <br />MPO Board for its consideration. Commissioner Jacobs is Orange County’s representative on <br />the MPO Board with Commissioner Rich as his alternate. <br /> <br />The OUTBoard also commented and a summary will be given at the meeting. <br /> <br />Next Steps <br />• December 13 – DCHC MPO Board to approve the Preferred Option and release full 2045 <br />MTP report and final Goals/Objectives/Targeted Performance Measures for public <br />comment. <br />• January 10 – DCHC MPO Board to adopt by resolution the 2045 MTP and report. <br /> <br /> <br />RECOMMENDATION(S): Planning staff recommends the Board: <br /> <br />1. Receive the presentation (Attachment 1). <br />2. Discuss as desired. <br /> 142
The URL can be used to link to this page
Your browser does not support the video tag.