Orange County NC Website
Article 4: Overlay Zoning Districts <br /> Section 4.7: Stoney Creek Basin <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 4-18 <br /> <br />4.7.34.6.3 Permitted Uses <br />Within the Major Transportation Corridor (MTC) District, uses of land and structures are those <br />permitted in the underlying zoning district or districts. All other requirements for the use of land <br />and structures contained in this Ordinance shall be met unless otherwise provided. <br />4.7.44.6.4 Building Setback and Yard Requirements <br />Building setback and required yard areas for the overlay district are as follows: <br />(A) The front yard requirement shall be 100 feet from the edge of the right-of-way of an <br />interstate highway or 50 feet from the edge of an intersecting road at an interstate <br />interchange. <br />(B) The rear yard requirement shall be 50 feet from the edge of the rear property line or 100 <br />feet from the edge of the right-of-way of an interstate highway when a rear yard is <br />adjacent to the interstate. <br />(C) The side yard requirement shall be 50 feet from the side property line or 100 feet from the <br />edge of the right-of-way of an interstate highway where the side property line is adjacent <br />to the interstate. <br />Section 4.8:SECTION 4.7: STONEY CREEK BASIN <br />4.8.14.7.1 Intent <br />(A) The purpose of the Stoney Creek Basin Overlay District is to implement the Stoney Creek <br />Basin Small Area Plan by: <br />(1) Encouraging the creation of open space and by limiting density increases within <br />the more rural portions of the area generally defined as the Stoney Creek <br />drainage basin; and <br />(2) Modifying certain Flexible Development regulations as contained in Section 7.13 <br />of this Ordinance, to encourage the distribution and intensity of development <br />areas and open space as specified in the Plan. <br />4.8.24.7.2 Applicability <br />(A) Generally <br />This district shall be applied to all of the areas contained in the Stoney Creek Basin Small <br />Area Plan, except for the portion of the Plan area located within the Rural Buffer (RB) <br />Zoning District. The Stoney Creek Basin Small Area Plan and Map was adopted by the <br />Orange County Board of Commissioners on August 5, 1996. <br />(B) With Other Regulations <br />Except for certain provisions as specified in Section 4.67.4, all other regulations for the <br />underlying zoning districts are applicable. <br />4.8.34.7.3 Land Use Intensities <br />Three levels of land use intensity are contained in the Stoney Creek Basin Small Area Plan. <br />These areas are designated in the Plan as lower, intermediate, and higher intensity areas, which <br />are identified, respectively, as Lower Intensity, Intermediate Intensity, and Higher Intensity <br />Development Areas within the Stoney Creek Basin Overlay Zoning District. <br />(A) Lower Intensity Development Area <br />The Lower Intensity Development Area includes land designated as lower intensity area <br />in the Stoney Creek Basin Small Area Plan. The Lower Intensity area best typifies the <br />area’s remaining rural character and is proposed to have the lowest average <br />development densities in the future. The current character of the area is residential <br />development on relatively large lots, with a considerable number consisting of large <br /> 117