Orange County NC Website
Article 5: Uses <br /> Section 5.10: Standards for Telecommunication Facilities <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-103 <br /> <br /> Evidence any applicable local, State, or Federal licensing, permitting, <br />development requirements have been satisfied. <br /> Standards of Evaluation. <br /> Facility shall be setback a minimum of 100 feet from all property lines. <br /> A Type D land use buffer, as detailed in Section 6.8.6 of thie Ordinance, shall be <br />installed/maintained along all property lines. <br /> <br />SECTION 5.10: STANDARDS FOR TELECOMMUNICATION FACILITIES <br />5.10.1 Intent 47 <br />The regulations contained herein are designed to provide for the safe and efficient integration of <br />facilities necessary for the provision of advanced wireless telecommunications services through <br />the community with the goal of establishing reliable wireless service to the public, governmental <br />agencies, and first responders in a manner that provides for the public safety and general welfare <br />of its citizens. <br />5.10.2 Master Telecommunications Plan (“Plan”) <br />(A) The Plan is intended to assist providers in their search for suitable locations to build their <br />service network. The County may develop the Plan (map), which would display locations <br />within the County’s zoning jurisdiction where property owners have expressed formal, <br />written, interest in allowing construction of telecommunications equipment. <br />(B) Information that may be shown on the base Plan will include, but not limited to: <br />(1) Existing towers, <br />(2) Major transmission lines, <br />(3) County-defined Natural Areas, <br />(4) Historic properties, <br />(5) Scenic corridors, <br />(6) Known bird migratory patterns through the County, <br />(7) Voluntary Agricultural Districts, and <br />(8) Publicly-owned or quasi-public lands. <br />(C) In order to participate in the Plan, all owner(s), or their legally binding representatives, <br />shall submit an application on a form prepared by the Planning Department requesting <br />inclusion. <br />(D) All telecommunication providers who elect to construct facilities on properties in the Plan <br />shall provide all necessary and requested information to the County's telecommunications <br />consultant. <br />(E) Modification of the Plan may be considered annually at the first Quarterly Public Hearing <br />of the calendar year, normally held in February. Any applicant requesting modification of <br />the Plan shall make application to the Planning Director on or before December 1st of <br />each year. The fee for modifying the Plan shall be that as set forth in the Orange County <br />Schedule of Fees. <br />(F) Withdrawal from the Plan is permitted if any owner submits, to the Planning Director, a <br />notarized statement requesting same. Upon receipt of the request, including any fee for <br />modifying the Plan as set forth in the Orange County Schedule of Fees, the Planning <br /> <br />47 Please note staff anticipates significant modifications to this Section as part of a future amendment package to  <br />address inconsistencies in ‘submittal’ and ‘project evaluation’ criteria.  <br /> 229